online room design by professional interior designers SIMPLE, AFFORDABLE and TOTALLY YOU.

  email us   facebook   pinterest   twitter   blogger

Email:   Password:   


Custom Family Room Designs

Trina Turk Wow!

Red ottomans make it fresh and fun. Can you say "chartreuse accents, and affordable Trina Turk pillows?" See the complete design.

Modern Family Style

family room gray
This modern family space started with a fresh gray and yellow color palette. Some funky side tables and mid-century modern chairs. This room design made the whole family happy.

Stylish Suburban

Fresh traditional styling. This open concept family space has everything. Can't wait for you to see the stone fireplace.

Learn More About Our Custom Designs

$149 Design Consultations - It's your own personal moodboard

This rustic warm living room uses rich reds, leather and rustic coffee and side tables to create the look these folks from Oregon loved.
Can you say coastal? This coastal living room takes blues and greens and white washed surfaces to a new more modern level. Coastal design, it's our specialty.
Tweens need glam too. This tween bedroom dazzles elegantly. The little lady will grow up happily ever after in this space.
Learn More About Design Consultation Services

Custom Bedroom Designs

Call Us: 877-789-5303

Guest Room / Office

Many of us don't have space for a separate guest bedroom and an office. This bedroom office combination with dark wood accents "works beautifully" (get it?)

Cute Cottage Style

This cottage style bedroom revolved around a purple and gray palette. White wood finishes, floral flourishes, a deep purple rug and roman shades enclose this cozy space.

Morrocan Inspired

You've seen Morrocan inspired furniture and accessories everywhere. This bedroom palette includes the gold, oranges, reds and pinks of the region and a must have mirrored chest and garden stools.

Fresh Preppy
zen guest bedroom

This sophisticated bedroom is a symphony of blue, yes you can combine navy and other's how to do it to created a slightly traditional but fun space.

Learn More About This Service

We can use your existing furniture

Long narrow family room design.

Who can buy all new furniture at one time? Not me! We love re-purposing, using your great furnishings and creating a whole new look with budget friendly additions.

We're kitchen crazy.  See this design.

$149 Custom Mood Board

Can't get your space put together? Neither could Lynn in her 'Mom Cave". So she ordered our Design Consultation service. In just a week, she had a professionally designed mood board for her special space.

And yes, we have lots more designs.....


Questions? Call us: 877-789-5303 or email us.

Online interior design| E-DECORATING |

Room Designs, room makeover, affordable room makeover, e-decorating, interior design, design consultation, moodboard, bath design, family room design, living room design, bedroom design, interior designer, decorating ideas, need help with decor, kids room designs, tween bedroom design, traditional design, empty nest design, coastal design, rustic designs. Virtual staging, staging, 3D renderings, 3D drawings, architectural drawings 
© 2016 My Design Guide, Inc. • P.O. Box 7242, Richmond, VA 23221 • (877) STYLE-03