online room design   
Your Sample # 1173 Your New Products Shopping
Grand Central - 1, ~STANDARD Design + More + More + More List






Focal Point  
Design Description

You have a great space, with lots of natural light and fireplace to serve as a natural focal point. The archways add a great architectural detail and keep the room open and accessible to other rooms. According to your style profile you are drawn to the clean lines of Asian design, with a touch of country, romantic and traditional style as well.

Perspective  
© 2013 My Design Guide, Inc. • 877 789 5303