online room design   
Your Sample # 1187 Your New Products Shopping
Master Bdrm Upstairs - 1, ~GRANDE Design + More + More + More List







Your existing bed is the focal point of the room and a real inspiration piece. We’ve selected the Belleport Garden Bedding from Macy’s introducing a crisp, peaceful large organic pattern in the room.

The bed is to be flanked by matching bronze and glass bedside tables that continue the room’s airy romantic feeling. There is room for white wicker baskets underneath the tables to contain those every day magazines and materials.

The writing desk and chair is a focal piece as well - a lovely space for reading and writing with its antiqued white finish and simple lines. Lots of storage so that it’s looks will be a prominent as its functionality.

The TV stand continues the antiqued style and also provides storage for media items and equipment. It’s glass front reinforces the antique sense of style and keeps the piece feeling light.

 

Behr Purple Essence #660E-2
by Behr

[click the store names below the images to shop]

Poundex Green bronze finish metal and glass nightstand
Sears

Hampton Bay White Writing Desk - Liberty Furniture
Mazel Tov Furniture

Hampton Bay White Desk Hutch - Liberty Furniture
Maz

Hampton Bay White School House Chair - Liberty Furniture
Mazel Tov Furniture

Tribeca Loft White TV Stand
Stacks and Stacks

Martha Stewart Bellport Garden Bedding
Macy's
© 2011 My Design Guide, Inc. • (877) STYLE-03