online room design   
Your Sample # 1264 Your New Products Shopping
Living Room - 1, ~STANDARD Design + More + More + More List







(click on the name of a supplier below to shop online)
1.Etsy - 13 x 19 Orange and Lavender Ikat Pillow Cover
2.Etsy - Celerie Kemble for Schumacher Hot Flowers in spark - 13X18 - Pattern on the front
3.Etsy - Coral Pink & Purple Ikat Print Pillow Cover
4.Etsy - Decorative Designer Pillow Cover - 18X18 - Thom Filicia for Kravet - CitySquares in Terratone
5.Home Decorators - Gervasio Floor Lamp
6.Etsy - Set of 2 / ROBERT ALLEN / Velvet Geo Pillow Covers / 18" x 18" / SeaGlass / Designer Fabric / Decorative Pillow
7.Etsy - Trina Turk Peacock Designer Indoor Outdoor Pillow Cover, Schumacher, 18x18, 20x20,22x22
8.Ann Saks - Crystal Glass, 12"x24" in Water
9.Anthropologie - Voluspa Cut Glass Jar, Goji Berry
10.Ballard Designs - Granada Rug, 9x12
11.Ballard Designs - Morgan End Table, in Rubbed Black, with baskets
12.Ballard Designs - UPHOLSTERED CUBE in Canvas Rust
13.Crate and Barrel - Blake Lounge Chair with Leather Cushion, in Coffee
14.Crate and Barrel - Colette Bench, in Tomato
15.Crate and Barrel - Lima Alpaca Citron Throw
16.Crate and Barrel - Set of 2 Moreno Nesting Tables
17.Pottery Barn - CLIFT GLASS TABLE LAMP
18.Pottery Barn - FAUX EAR CORAL
19.Thibaut - Royal Wallpaper in Citrus T762
20.Wisteria - Hand-Glazed Grove Bowl - New
21.Wisteria - Interlocking Rings Stool
22.Z Gallerie - Ceramic Books - Aquamarine Set of 8
23.Z Gallerie - Zinc Display Boxes
24.Sherwin Williams - SW 6944 Pool Blue
 
© 2012 My Design Guide, Inc. • (877) STYLE-03