A licensed general contractorthat runs the job and hires the specialists
MDG Builders is the trade name of My Design Guide Inc, a California general contractor in Tarzana, license CSLB #1040337, licensed since 2018. MDG has no employees. It designs, permits and manages each project, and licensed subcontractors perform the field work under a written scope and a set schedule.

What is MDG Builders, and who stands behind it?
My Design Guide Inc is a California corporation that does business as MDG Builders. The state first issued the license in June 2018, and the CSLB record shows it as current and active, with a contractor's bond filed.
The company sells, designs, permits and manages residential projects. It does not run a crew. The CSLB record lists workers' compensation as exempt because the company has no employees, which means every person working on your property belongs to a licensed subcontractor.
The owner is the qualifier named on the license, so responsibility for the license sits with a named person and not only with a company name.
For you, the practical effect is one signature. You contract with MDG, not with each trade, and the proposal, the schedule and the permits are MDG's to run. The subcontractors answer to MDG on site. The trade-off is that start dates depend on specialists' calendars and on permit timing, so the schedule is something we put in writing and update as the job moves.
What does the design side of a design-build contractor mean?
Before a permit or a price, someone has to decide what is being built: which walls move, where the plumbing runs, which finishes go where, and whether the plan meets the city's rules. At MDG that planning is the design step, and it ends in a written scope and, where the city requires them, plans for the permit application.
The site visit drives it. We measure, take photographs and ask what you want the room or the yard to do. A short cosmetic remodel may need little more than a clear scope, while an ADU or an addition goes through plan check at the building department before anyone can pull a permit. You approve the scope in writing before any trade is booked.
Design also means saying no to a plan that will not pass. If a wall you want removed carries load, or a window opening is too close to a property line, it is cheaper to find out on paper than after a framer has started. Our kitchen remodel permit guide shows the kind of checking that happens before work starts.

How does MDG Builders choose and manage subcontractors?
Each trade on an MDG job is performed by a subcontractor who holds the California license for that trade. MDG looks the license up on the CSLB site before scheduling the work and confirms that it is active. You may ask for any subcontractor's license number and certificate of insurance at any point.
Management starts on paper. Each trade gets a written scope, so the tile setter and the plumber both know what belongs to whom. MDG then sets the order of work, books the inspections the permit calls for, and checks finished work against the scope before the next trade begins.
None of this removes your right to check. The guide on how general contractors use subcontractors lists what to ask any contractor about the people who will be on your property, and how to check a contractor license shows the CSLB steps.
- License checked at cslb.ca.gov before a trade is scheduled
- A written scope for each trade
- A schedule that puts the trades in sequence
- City inspections booked at the stages the permit requires
- A final walkthrough with a list of open items
Who answers the phone at MDG Builders?
Calls to (888) 666-8224 reach the MDG office in Tarzana from 8 a.m. to 5 p.m. Monday through Thursday and from 8 a.m. to 2 p.m. on Friday. The office is closed on weekends.
The contact form arrives by email at info@mydesignguide.com. We answer by phone or email, and by text only if you ticked the optional consent box. Questions about a quote go to the same people who write the proposal, and questions about the license can be checked directly on the CSLB lookup.
The reviews on this site come from Houzz, and they are old. The reviews page shows them with their dates. If you are ready to talk about a project, the contact page has the form and the hours.
MDG Builders at a glance
Every line below can be checked against the CSLB license record or the Houzz profile.
| Legal name | My Design Guide Inc, doing business as MDG Builders |
| License | CSLB #1040337, current and active |
| Classifications | B General Building; C-61/D12 Synthetic Products |
| Bond | Contractor's bond filed with the state |
| Licensed since | 2018 (CSLB issue date June 7, 2018) |
| Workers' compensation | Exempt: no employees; all field work is performed by licensed subcontractors |
| Houzz | 5.0 rating on the MDG profile; reviews dated June to November 2018 |
| Service area | Los Angeles, Ventura and Orange counties, Antelope Valley, Inland Empire, San Diego County, San Francisco Bay Area |
| Hours | Monday to Thursday 8 a.m. to 5 p.m.; Friday 8 a.m. to 2 p.m.; closed Saturday and Sunday |
| Phone | (888) 666-8224 |
Ready to plan your project?
Call or send the form. We schedule a site visit and send a written proposal.