Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Legal

Terms of Use

Using this website

By using mydesignguide.com you agree to these terms. The site is operated by My Design Guide Inc, doing business as MDG Builders, in Tarzana, California. Last updated November 4, 2026.

The pages give general information about remodeling and construction. They are not legal, engineering or architectural advice, and they do not create a contract between you and MDG Builders.

Prices on this site are ranges, not quotes

Cost figures on this site are informational ranges drawn from the sources named on each page, for the geography and year stated there. They are averages, and they are not an offer, a quote or a promise about what your project will cost.

A real price comes only in a written proposal after a site visit. Material choices, access, structure, permits and local fees can place your project outside any published range.

Proposals and contracts are written and signed

MDG Builders begins work only under a written proposal or contract signed by you and by MDG. A conversation, an email, a text message or a figure on this website does not commit either side to a price or a scope.

How projects are delivered

MDG Builders sells, designs, permits and manages projects as a licensed general contractor. The company has no employees, and the field work is performed by licensed subcontractors under the scope in your signed proposal. You may ask for each subcontractor's license number and certificate of insurance.

License information

My Design Guide Inc holds California Contractors State License Board license #1040337, with classifications B General Building and C-61/D12 Synthetic Products. The current status of any license can be confirmed at cslb.ca.gov.

Photographs and reviews

Photographs on the service pages illustrate a type of work and are not pictures of a specific MDG project unless a caption says so. The reviews page quotes reviews posted on Houzz in 2018; they belong to their authors and are shown with the dates Houzz displays.

Text messages

Text messaging is optional and explained in the Privacy Policy. Reply STOP to opt out or HELP for help.

Outside links

Links to the CSLB, California statutes, city agencies and Houzz are provided for your convenience. We do not control those sites and are not responsible for their content.

Limits on our responsibility

To the extent the law allows, MDG Builders is not liable for decisions you make based on the general information on this site. Laws, fees and permit rules change, so confirm them with the responsible agency before you rely on them. These terms are governed by California law.

Changes to these terms

We may update these terms as the site or the law changes. The date at the top shows the latest version, and continued use of the site means you accept the current one.

Questions

Contact MDG Builders at (888) 666-8224 or info@mydesignguide.com. If any part of these terms is found to be unenforceable, the rest remain in effect.

Call (888) 666-8224