Request a site visit and a written proposal
How do I contact MDG Builders?
Call (888) 666-8224, email info@mydesignguide.com or use the form. Give us the project type and ZIP code, and add details if you have them. A price follows only after we have seen the property.
Call
(888) 666-8224
Hours
Mon to Thu, 8 AM to 5 PM
Friday, 8 AM to 2 PM
Saturday and Sunday closed
Based in
Tarzana, CA · CSLB #1040337
What happens after you send the form?
- We read your requestThe form reaches the MDG inbox as an email. We reply by phone or email, and by text only if you ticked the optional consent box.
- We book a site visitAt the property we measure, look at existing conditions and ask about your budget and timing.
- A proposal arrives in writingIt lists the scope, the materials and the price, and you can show it to any other contractor you are considering.
- You decideWork starts only after you sign. The signed proposal is the point where permits are applied for and subcontractors are booked.
Questions before you reach out
What are the office hours?
Monday to Thursday from 8 a.m. to 5 p.m. and Friday from 8 a.m. to 2 p.m. The office is closed on Saturday and Sunday. Form submissions that arrive outside those hours are answered once the office opens.
Can I text MDG Builders?
Only if you tick the optional consent box on the form. Consent is not required to send a request, message frequency varies, and message and data rates may apply. Reply STOP to any text to opt out.
What should I put in my request?
The project type, your ZIP code, what you want changed and any deadline. Mention drawings or permits you already have. Photos are welcome to bring up when we reply, but the form does not need them.
Where is the MDG Builders office?
In Tarzana, California. The office takes calls and form requests during business hours, but site visits happen at your property, so you do not have to travel to us at any stage before the proposal.
Will you give me a price over the phone?
No, because a price given sight unseen is a guess. We can point you to the published ranges that fit your kind of job so you can set a rough budget, and the real price arrives in the written proposal after the site visit.