Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Painting

Interior and Exterior Paintingin Los Angeles and Southern California

Quick answer

Painting the outside of a Los Angeles house typically costs $2,947 to $6,484, and interior work runs $2 to $6 per square foot of floor area, according to Angi's Los Angeles pages. Prep takes more time than painting, and homes built before 1978 fall under EPA lead-safe rules. MDG manages licensed painting subcontractors.

CSLB #1040337 5.0 on Houzz Free written estimate
Exterior of a California Craftsman bungalow freshly painted warm white with dark charcoal trim and a deep green front door, wide front porch
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work
Cost

How much does it cost to paint a house in Los Angeles?

Angi publishes Los Angeles pages for exterior and interior painting, and they are the only local figures with a stated date that we found. Interior work is priced by floor area and exterior work by the size of the home, so the two do not compare directly.

What it coversTypical rangeWhat moves the price
Exterior, whole house$2,947 to $6,484Angi's Los Angeles average is $4,692; stucco prep, trim and condition move it
Exterior, per square foot of home$2.20 to $5.90Each added story adds about 50 percent
Interior, per square foot of floor area$2 to $6Ceiling height, trim, color count and wall repair
Interior, Angi's Los Angeles project range$1,282 to $3,784Average $2,525, which is low against Angi's own per-foot table, so read it as small jobs
Extra prep in older homes$0.50 to $0.75 per sq ft morePatching and surface repair in older Los Angeles homes
UV-resistant paint$10 to $20 more per gallonSun-exposed walls

How we got these numbers: Angi's Los Angeles pages on exterior painting (updated November 2025) and interior painting (August 2026) supply every figure above. Angi does not publish its method, so our confidence is medium to low. Thumbtack's Los Angeles interior page shows $579 to $2,287 but does not say what size of job it covers, so we left it out. Remodeling magazine's 2025 Cost vs. Value report for Los Angeles has no painting project. Federal pay data (BLS, May 2025) puts Los Angeles painters at an average of $29.71 an hour, which is pay, not a billing rate. A proposal measured at your house is the real price.

  1. Angi, exterior painting cost in Los Angeles (2025)
  2. Angi, interior painting cost in Los Angeles (2026)
  3. U.S. Bureau of Labor Statistics, OEWS wages, Los Angeles metro (2025)
Interior prep

How is a room prepared for painting, and how should a quote measure it?

Most of a painter's day happens before the first coat. Furniture is pushed to the middle and covered, floors get drop cloths, switch plates come off, and holes and cracks are patched and sanded. Edges that must stay clean are taped, and patches get primer so the topcoat dries to an even look.

Ask how the quote is measured. Angi prices interior work per square foot of floor area, while some painters price by wall area, with ceilings and trim as separate items. A floor-area quote and a wall-area quote cannot be compared until both are turned into the same list of rooms and surfaces.

A quote should say what it covers: walls, ceilings, trim, doors, closets, the number of coats, the paint product line and who buys materials. Ceilings are the item people forget, so have them listed.

  • Which surfaces, and how many coats on each?
  • Which primer goes on repairs and stained spots?
  • Who protects floors and furniture, and who cleans up?
Interior room prepared for painting: blue painter tape along white trim, drop cloths on the floor, a roller on a paint tray, primed walls
Finish quality

What does a clean paint line look like, and how many coats does it take?

The line where a wall meets white baseboard shows how careful the painter was. Painters call it cutting in. A crisp edge comes from a taped or steady hand-cut line with the right amount of paint on the brush, and a second coat cannot fix a sloppy first one.

Sheen changes both the look and the upkeep. Flat paint hides wall flaws but marks easily. Satin and semi-gloss wipe cleaner, which is why they are the usual choice for trim, doors, kitchens and bathrooms. A dark color over a light one may need a tinted primer or an extra coat, so ask what the price assumes.

Check the work in daylight, with the room lights off, standing at a low angle to the wall. Roller marks, missed spots and thin coverage show up that way. Point them out while the crew is still there.

Close-up of a crisp straight paint line between a soft sage wall color and white baseboard trim
Process

How does MDG run a painting project?

A painting job is simple only when the early steps are done carefully.

  1. Tell us what needs paintCall or use the form. Give the year the home was built, which rooms or sides of the house, and whether there is stucco, wood siding or cabinets.
  2. Walk the house with usWe look at chalking, peeling, cracks, stained ceilings and bare wood, and measure surfaces rather than guess from square footage.
  3. Receive a written proposalIt lists surfaces, prep, products, coats and a contract price, in the form Business and Professions Code section 7159 requires for work over $500.
  4. Settle lead and permit questionsWe confirm whether the lead-safe rule applies and ask the city whether anything beyond painting, such as scaffolding or repairs, needs a permit.
  5. Painters do the workA licensed painting subcontractor preps and paints. Any extra work goes on a written change order first.
  6. Final walkthroughYou inspect with us, we list touch-ups and the job closes once the list is done.
Stucco

Can you paint stucco, and how is it prepared?

Yes, stucco can be painted, and a great deal of Southern California stucco is. The prep decides the result. The painter washes off dirt and chalk, scrapes loose paint, patches cracks and chips with a stucco-compatible patch and lets the repair dry for as long as the patch maker specifies. Then comes a masonry-rated primer and topcoat.

Find out first whether your stucco has ever been painted. In Houzz forum threads, homeowners warn that sealing colored stucco that was never painted can trap moisture. Treat that as a question for your painter, not a rule.

Repairs belong to another trade. California licenses stucco application and repair as lathing and plastering, class C-35, while painting is class C-33, so large crack or patch work may come from a plastering subcontractor first.

Angi's Los Angeles exterior page says stucco costs more to paint because of the preparation and the paint it needs. That is the publisher's view, not a measured premium, so ask bidders to price stucco prep as its own line.

Freshly painted light gray stucco exterior of a house with a terracotta tile roof and new white trim, sunny
Rules

What do EPA and California rules require when you paint an older house?

Painting is class C-33 on the Contractors State License Board's list. Section 7048 of the Business and Professions Code sets a $1,000 ceiling, materials included, for unlicensed work, and the ceiling does not apply to work that needs a permit. MDG, CSLB #1040337, does not hold the painting class: it sells, scopes and manages the job, and a licensed painting subcontractor paints. You may ask for that subcontractor's license number and proof of insurance.

A house built before 1978 may contain lead paint. The EPA's Renovation, Repair and Painting rule (40 CFR Part 745, Subpart E, section 745.82) covers paid work in housing built before 1978 and requires the firm to be EPA-certified, sole proprietors included. California is not on EPA's list of states that run their own program, so EPA runs it here.

  • Small jobs are exempt: 6 square feet or less of painted surface per room inside, or 20 square feet or less outside, with no window replacement or demolition. Work in the same room within 30 days adds together (section 745.83).
  • A written lead determination from a certified inspector, or a certified renovator's negative test-kit result for each affected component, takes a job out of the rule.
  • Three practices are prohibited: open-flame burning, high-speed sanding, grinding or blasting without shrouds and a HEPA vacuum, and heat guns at 1,100 degrees Fahrenheit or hotter (section 745.85).
Timeline

How long does a painting job take?

These ranges are for planning. Weather, repairs and drying times can stretch them, and the schedule in the written proposal is the one that counts.

  • 1 to 2 weeksColor choice and proposalSwatches go on the wall and the proposal fixes surfaces, coats, products and price.
  • 1 to 3 weeksLead checks and schedulingFor a pre-1978 house the lead-safe plan comes first, then the painter is booked.
  • 2 to 5 daysPrep and repairsWashing, scraping, patching and priming. Stucco or wood repairs add days.
  • 2 to 7 daysPaintingSize, number of colors and coats set the length, and outdoor work can wait on weather.
  • 1 dayWalkthrough and touch-upWe go over the work in daylight and mark spots to fix.
Cabinets

Are painted kitchen cabinets worth it, and do they last?

Painting keeps your existing boxes and layout, which is the point of choosing it over refacing or replacing. Whether it lasts depends on prep and product more than brand. Cabinets collect grease, steam and daily wipe-downs, so the surface is degreased, scuff-sanded and primed with a bonding primer, then coated with an enamel made for hard use.

We have no independent data on how many years painted cabinets last, so we print no number. Ask the painter to name the primer and the enamel, to state how long the finish must cure before doors can close against each other, and to say what happens if edges chip in the first year.

Doors and drawer fronts are usually removed and numbered, and the frames are painted in place. Decide before work starts whether you are keeping the hinges and pulls, since changing them later means filling and drilling again. In a pre-1978 kitchen, the EPA rule above can apply, because sanding doors disturbs painted surface. The kitchen remodel cost guide compares painting with bigger changes.

Kitchen cabinets freshly painted a deep forest green with brass hardware, white quartz counter, bright room
Color

How do you pick a paint color that holds up in Southern California light?

Test color on the wall itself. Paint swatches a couple of feet square on two different walls and look at them in the morning, at noon and in the evening. Plaster, stucco and drywall each take color differently from a printed chip.

Light here is strong and changes from room to room. A color that reads as soft sage at noon can look gray in a north-facing room. Set two or three neutrals side by side to see the undertone before you buy a gallon.

Angi's Los Angeles exterior page names sun fading as a concern and lists UV-resistant paint as an add-on, so ask whether the product line has fade-resistance data. In an HOA, ask the association whether exterior colors need approval before paint is ordered. New windows or roofing done first can save repainting.

Several square paint swatches painted directly on a plaster wall in soft neutral tones, daylight, no writing
Where we build

Painting by city

FAQ

Painting questions homeowners ask

How much does it cost to paint a house in Los Angeles?

Angi's Los Angeles pages put exterior painting at $2,947 to $6,484, with an average of $4,692, and interior painting at $2 to $6 per square foot of floor area. Stucco, a second story, older paint and repairs push a quote toward the top. These are one publisher's figures, so a measured written proposal is the number to rely on.

How much does it cost to paint a 2,000 square foot house?

Angi's Los Angeles exterior page lists $4,450 to $11,850 for a 2,000 square foot home, and the interior per-foot range works out to $4,000 to $12,000 at the same size. Stories, stucco, trim and the condition of old paint make the ranges wide. Ask for exterior and interior quoted separately.

Is $50 an hour good for a painter?

A rate by itself says little, because a low hourly rate with slow work can cost more than a higher rate with a fast crew. Angi's national page lists $20 to $50 an hour, so $50 is at the top of that range. Compare quotes by scope: surfaces, coats, products and a total price.

Do you need a permit to paint the exterior of a house in Los Angeles?

Usually not for painting alone. Los Angeles Municipal Code section 91.106.2 lists painting, papering and similar work among work that needs no permit, but it excludes washing or blasting on upper stories beside a public sidewalk. Scaffolding, structural stucco repair or window replacement may bring other permits, so ask your city's building department.

Do you need a contractor's license to paint a house in California?

Yes, for nearly all paid jobs. Painting is class C-33, and section 7048 of the Business and Professions Code exempts only jobs under $1,000 that need no permit and are not advertised as contractor work. MDG manages painting projects with licensed painting subcontractors. Ask for each subcontractor's license number.

How often should I repaint my house in Los Angeles?

We found no independent repaint interval for Los Angeles, so watch the house. Chalky residue on your hand, peeling, cracked caulk, faded color and bare spots all mean the coating is wearing out. Repaint before bare spots reach the stucco or wood.

Does repainting a house add value?

We found no independent figure for Los Angeles. Remodeling magazine's 2025 Cost vs. Value report for the city has no painting project, so a percentage you see online is not from that source. If you are selling, ask a local listing agent which rooms or sides matter most.

How many coats of paint does the exterior of a house need?

Two finish coats over a sound, primed surface is the usual specification, with primer first on bare, patched or stained areas. A worn surface or big color change may need more. The paint label states the minimum, and the proposal should state the number of coats.

What is considered low-VOC paint, and what does California require?

VOC means volatile organic compounds, and the South Coast Air Quality Management District, which includes Los Angeles, limits them in architectural coatings under Rule 1113. In the version we read, amended in February 2016, nonflat coatings are limited to 50 grams per liter and primers, sealers and undercoaters to 100. Ask for the product's data sheet, since later amendments may change that.

What should I expect from a painting contractor?

Expect a written scope, a license number you can check, daily cleanup, protection for floors and furniture, and a final walkthrough. For a house built before 1978, also expect EPA lead-safe certification. A contract over $500 must follow section 7159, including a signed contract price.

Free estimate

Get a written painting quote

Tell us the year your home was built and what needs paint. We will walk the house and send a proposal that lists every surface.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224