Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Guides

Remodeling, ADU and permit guides for California homeowners

Quick answer

The MDG Builders blog has twelve guides on what California remodels and ADUs cost, which Los Angeles permits apply, how to check a contractor's license and how general contractors use subcontractors. Every price names its source, its city and its year.

Guides

Which guide answers your question?

Start with a cost guide if you are budgeting, a permit guide if you are about to apply, or the license guide if you are comparing bids. Each lists its sources so you can check our reading. The cost guides cover kitchens, bathrooms, ADUs, roofing and flooring, the permit guides focus on Los Angeles, and the contractor guides explain licensing and subcontracting. Prices in every guide come from named sources and say which year they describe.

Unfinished white cabinet door fronts and drawer fronts laid flat on a clean subfloor in a gutted kitchen

How Much Does a Kitchen Remodel Cost in California?

Sourced Los Angeles kitchen remodel prices for 2025 and 2026, why they disagree, and how to read a bid line by line.

Read the guide →
A freshly built shower base with a linear drain set into a sloped mortar bed, shallow water standing in it for a flood test

How Much Does a Bathroom Remodel Cost in California?

Los Angeles bathroom remodel prices by scope, what a new bathroom adds, and the permit and contract rules that touch the total.

Read the guide →
Exterior of a small detached ADU in a Southern California back yard: a flat-roofed stucco studio in warm gray with a wood-framed glass door

How Much Does an ADU Cost in California?

Sourced 2026 ranges for garage conversions and detached ADUs in Los Angeles, and how old the survey numbers are.

Read the guide →
A Southern California back yard at dusk seen from the lawn: the main stucco house on the left and a small detached stucco ADU on the right

ADU vs JADU in California: What Is the Difference?

Size, kitchen, owner occupancy, rent rules and parking: how a junior ADU differs from a full ADU under current state law.

Read the guide →
The front of an attached two-car garage in Los Angeles with the roll-up door removed and the opening framed in new 2x4 studs at 16 inches on

Garage Conversion Permit Steps in Los Angeles

The permit path for turning a Los Angeles garage into an ADU, with the LADBS conversion checklist and the state deadlines.

Read the guide →
A single-story stucco house in Southern California with its back yard laid out for a project: wooden stakes and string lines marking a recta

Room Addition vs ADU: Which Should You Build?

Cost, permits, rules and income compared for a Los Angeles homeowner choosing between building onto the house and building a second unit.

Read the guide →
An open kitchen wall at rough-in stage showing a copper gas stub-out with a closed shutoff valve

Do You Need a Permit for a Kitchen Remodel in Los Angeles?

Which kitchen changes get an LADBS Express Permit, which go to plan check, what the 2025 Energy Code adds, and what we could not confirm.

Read the guide →
A closed laptop, a white hard hat and a rolled set of plans on a pale kitchen island in a house mid-remodel, window light from the left

How to Check a Contractor's License in California

Read a CSLB license record line by line, learn what a B license means, and see MDG's own record as a worked example.

Read the guide →
An unfinished room addition seen from a Southern California back yard: wood wall framing complete, roof trusses set

How General Contractors Use Subcontractors

Why most general contractors hire specialists for the field work, what that means for you, and what to ask for in writing.

Read the guide →
A roll-off dumpster half full of old gray composition shingles at the edge of a driveway

How Much Does a Roof Replacement Cost in Los Angeles?

Per-square-foot roof prices for Los Angeles with sources, a worked example by roof size, and the permit, fire-zone and contract rules.

Read the guide →
An open cardboard box of large-format porcelain tile with a handful of plastic spacers beside it and a notched trowel lying on a bare concre

How Much Does Flooring Installation Cost in Los Angeles?

Per-square-foot flooring prices for Los Angeles with sources, a room-sized worked example, slab moisture, and who is licensed to install.

Read the guide →
Two shower wall sample boards leaning side by side against a plaster wall: on the left a glazed ceramic tile board with visible grout lines

Microcement vs Tile: Which Holds Up Better in a Bathroom?

How microcement and tile differ in installation, wet-area performance and upkeep, using only facts we could verify.

Read the guide →

How Long Does a Roof Last in Southern California?

Roof life by material from a published inspector chart, what inland heat does to shingles, and why tile roofs get new underlayment.

Read the guide →

Tile or Composition Shingle: Which Roof Fits a Southern California Home?

Tile against composition shingle on weight, structure, price per square foot, lifespan and fire rating, with city weight limits.

Read the guide →

Cool Roof Requirements in California: What Title 24 Means for a Re-Roof

When a re-roof triggers the Title 24 cool roof rule, the reflectance numbers, the Southern California zones covered, and the exceptions.

Read the guide →

Roof Repair or Replacement: How to Decide in California

How to choose between a roof repair and a full replacement: age, layers, the percentage rules cities use, permits and a worked example.

Read the guide →

Wildfire Hardening for Your Roof: Class A Roofs, Vents and Fire Zone Rules

What a Class A roof is, how ember-resistant vents work, and what fire zone rules require when a Southern California home is re-roofed.

Read the guide →

How Much Does Window Replacement Cost in Los Angeles?

Whole-house and per-window prices for Los Angeles with named sources, a twelve-window worked example, and the local rules that add cost.

Read the guide →

Do You Need a Permit to Replace Windows in Los Angeles?

Same-size swaps are an LADBS Express Permit; new or resized openings are not. Plus how Santa Clarita, Irvine, San Diego and others differ.

Read the guide →

Title 24 Window Requirements in California: U-Factor and SHGC Explained

2025 Energy Code limits for replacement windows by climate zone, reading the NFRC label, the 75 square foot exception and a worked example.

Read the guide →

Vinyl vs Fiberglass vs Aluminum Windows in California

How each window frame handles Southern California heat, wildfire zones and salt air, what each costs, and where a city can rule one out.

Read the guide →

Egress Window Requirements in California: Bedroom and Basement Sizes

Escape opening sizes in the 2025 California Residential Code, with the math, the replacement exemption, and ADU and garage conversion rules.

Read the guide →

How Long Does a Kitchen Remodel Take in Los Angeles?

A week-by-week kitchen schedule for Los Angeles: the LADBS permit step, cabinet and countertop waits, inspections and common delays.

Read the guide →

Do You Need a Permit for a Kitchen Remodel in San Diego?

San Diego's No-Plan Building Permit for kitchens, what is exempt, what goes to plan review, the 45-year historic check and County rules.

Read the guide →

Do You Need a Permit to Remove a Kitchen Wall in California?

Opening a kitchen to the living room: load-bearing clues, when an engineer is required, permit paths in LA and San Diego, and cost.

Read the guide →

Cabinet Refacing vs. Replacing: Which Makes Sense for Your Kitchen?

Refacing or new cabinets: dated price ranges, a 25-linear-foot example, when each works, and California permit and contract rules.

Read the guide →

Quartz vs. Granite Countertops: Cost, Care and California's Silica Rules

Quartz or granite: dated prices, a 45-square-foot example, upkeep, and what Cal/OSHA's engineered stone silica rules mean for buyers.

Read the guide →

How Long Does a Bathroom Remodel Take in Los Angeles?

A sample five-week hall bath schedule, the waiting days no crew can skip, and what LADBS inspection timing does to the calendar.

Read the guide →

Does a Bathroom Remodel Need a Permit in Los Angeles?

Which bathroom work LADBS issues as an Express Permit, what goes to plan check, how nearby cities differ, and what the inspector signs.

Read the guide →

Shower Waterproofing in California: What Does the Code Require?

Backer boards, membranes, the 72 inch rule, how a shower pan flood test works and what inspectors in Southern California ask to see.

Read the guide →

How Much Does a Tub-to-Shower Conversion Cost in California?

Dated national ranges by shower type, a line-by-line worked example, permit rules by city and what an accessible walk-in shower needs.

Read the guide →

What Does It Cost to Add a Bathroom in California, and What Permits Apply?

Los Angeles cost figures for a bathroom addition, the code clearances that set room size, permit paths by city and the property tax effect.

Read the guide →

How Long Does an ADU Permit Take in Los Angeles?

The 15-business-day and 60-day state clocks, the Los Angeles clearances that sit outside them, and a day-by-day worked example.

Read the guide →

How Close to the Property Line Can You Build an ADU in California?

The 4-foot side and rear rule, the 16, 18 and 25 foot height floors, the size caps a city cannot go below, and a lot-fit example.

Read the guide →

Do You Pay Impact Fees on an ADU Under 750 Square Feet?

What the 750 square foot exemption covers, what it leaves out (school, utility and permit charges), and the Los Angeles fee lines by name.

Read the guide →

How Much Does It Cost to Convert a Garage Into an ADU in California?

Survey medians for garage ADUs, why conversions cost less than detached units, and the code fixes that push an old garage's price up.

Read the guide →

How Do You Pay for an ADU in California?

Cash, HELOC, cash-out refinance, renovation mortgages and local loans, plus how lenders count ADU rent and where the state grant stands.

Read the guide →

How Much Does a Second-Story Addition Cost in Los Angeles?

Sourced per-square-foot ranges for building up in Los Angeles, a 600 sq ft example, R1 height rules, timeline and the move-out question.

Read the guide →

What Do You Need for a Room Addition Permit in Los Angeles?

The LADBS plan list, when an engineer is needed, 2025 Energy Code items, utility and agency sign-offs, school fees and inspections.

Read the guide →

Home Addition Cost per Square Foot in California: What the Numbers Mean

Sourced cost per square foot for additions, Los Angeles against the Pacific region and the nation, and one room priced three ways.

Read the guide →

SB 9 Lot Splits and Duplexes in Southern California: What Is Allowed?

What SB 9 lets a single-family lot owner build or split, who qualifies, the 40 percent rule, fire-zone limits and Los Angeles practice.

Read the guide →

Can You Rent Out an ADU in California? Owner Occupancy and Short-Term Rules

State law on ADU owner occupancy and 30-day minimums, Airbnb limits in Los Angeles and San Diego, and how rent control treats a new unit.

Read the guide →

How Much Does Exterior House Painting Cost in Los Angeles?

Exterior paint prices for Los Angeles by house size and stories, what stucco prep adds, a worked example and the permit and contract rules.

Read the guide →

How Much Does Interior Painting Cost in California?

Interior painting prices per square foot and per room, why tall ceilings and older walls cost more, and what paint grade really changes.

Read the guide →

Lead Paint Rules for Older Homes in California: What Applies Before You Renovate?

The EPA renovation rule for pre-1978 homes, the 6 and 20 square foot limits, California's own presumption, and what to ask a contractor.

Read the guide →

When Is the Best Time to Paint a House Exterior in Southern California?

Month by month: rain, morning dew, primer temperature limits and summer wall heat, from National Weather Service normals and paint labels.

Read the guide →

Hardwood vs. Luxury Vinyl Plank: Which Floor Fits a California Home?

Hardwood, engineered wood and LVP compared on cost, slab moisture, sun, water and repair, with real installation limits from the makers.

Read the guide →

What Does It Cost to Replace a Concrete Driveway in Los Angeles?

Per-square-foot driveway prices for Los Angeles with dates and sources, tear-out costs, a 720 sq ft worked example and the deposit cap.

Read the guide →

Do You Need a Permit for a Concrete Driveway in Los Angeles?

The street apron needs a Bureau of Engineering A-Permit. Width limits, banned curb cut locations, city inspection fees and the steps.

Read the guide →

Stamped Concrete or Pavers: Which Is Better for a California Yard?

Stamped concrete and pavers compared on installed price, repairs, sealing, drainage and clay soil, with dated Los Angeles numbers.

Read the guide →

How Much Do Polished Concrete Floors Cost in California?

Polished concrete pricing by grind depth and gloss, what the slab under your old flooring has to pass, and a 600 square foot worked example.

Read the guide →

Concrete Slab Cracks in Southern California: When Should You Worry?

Which slab cracks are shrinkage and which point to soil movement, how to track a crack, the drainage numbers in the code, and who to call.

Read the guide →

Do You Need a Permit to Build a Deck in Los Angeles?

The 30-inch rule in the Los Angeles code, how far a deck may reach into a yard, and what inspectors check at the ledger, footings and guard.

Read the guide →

Composite vs. Wood Decking in California: Cost, Lifespan, Fire Rating and Heat

Wood costs less to build and returns more at sale. Composite asks for less upkeep. Sourced costs, wildfire-zone rules and the heat question.

Read the guide →

Hillside Deck Rules in Los Angeles: Zoning, Soils Reports, Fire Zones and Engineering

What changes when a deck goes on a Los Angeles slope: yard limits, retaining wall counts, soils and geology work, and fire-zone materials.

Read the guide →

How Tall Can a Fence Be in California? Front and Backyard Limits in Los Angeles and Nearby Cities

No single fence height applies in California. Limits for Los Angeles, Long Beach and San Diego, plus the spite fence and neighbor laws.

Read the guide →

Block Wall vs. Wood Fence in California: Cost per Linear Foot, Permits and Lifespan

A block wall costs several times what a wood fence does and can outlast it by decades. Per-foot math, Los Angeles permit rules and licenses.

Read the guide →

How Much Does a Microcement Shower Floor Cost?

The only published prices for a microcement shower floor come from sellers. Here is what they say, the arithmetic, and what a bid must list.

Read the guide →

How to Read a Remodeling Contract in California, Page by Page

The headings state law requires in a home improvement contract: price, down payment, progress payments, dates, change orders and notices.

Read the guide →

Home Improvement Contract Red Flags in California: 12 Warning Signs

Twelve warning signs in a contractor's pitch, payment terms and paperwork, each checked against CSLB guidance and California statute.

Read the guide →

Mechanics Lien Release Forms in California: Which of the Four to Use

Conditional and unconditional lien releases for homeowners: the four statutory forms, the 20-day notice, deadlines and a worked example.

Read the guide →

How to Choose a General Contractor in Los Angeles

Pick a general contractor in Los Angeles step by step: three matched bids, license and bond checks, city permit records, reference calls.

Read the guide →

Ready to plan your project?

Call or send the form. We schedule a site visit and send a written proposal.

Call (888) 666-8224