Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Painting costs

How Much Does Exterior House Painting Cost in Los Angeles?

Quick answer

Exterior house painting in Los Angeles costs about $2.20 to $5.90 per square foot of home, and Angi's Los Angeles figures put a typical job between $2,947 and $6,484, with an average of $4,692. A second story adds roughly half again, and stucco repair, peeling paint and trim count move the total most.

By MDG Builders · November 9, 2026

missing photo

What do painters charge to paint a house exterior in Los Angeles?

The only dated Los Angeles price source we found is Angi, the home services marketplace. Its Los Angeles exterior painting page, updated November 13, 2025 and read by our research in November 2026, reports an average of $4,692 and a typical range of $2,947 to $6,484. It prices the work at $2.20 to $5.90 per square foot of home, which means floor area, not wall area. Angi does not publish its method, so treat them as a planning range.

Its size table lists $2,225 to $5,925 for a 1,000 square foot house and $4,450 to $11,850 for 2,000 square feet. The same page says each added story raises the price by about 50 percent, because ladders give way to scaffolding or lifts.

Cost

Exterior painting price table for Los Angeles homes

Ranges are from Angi's Los Angeles exterior painting page, updated November 13, 2025, per square foot of floor area. The two-story row applies Angi's rule of about 50 percent more per added story.

What it coversTypical rangeWhat moves the price
Per square foot of home$2.20 to $5.90Siding type, paint condition, trim count, access
2,000 sq ft house, one story$4,450 to $11,850Stucco repair, eaves, doors and garage door
1,800 sq ft house, two stories (our arithmetic)$5,940 to $15,930Scaffolding or lift, slower work at height
Typical reported job, any size$2,947 to $6,484 (average $4,692)Angi Los Angeles figures; method not published
Painter wage, LA metro$29.71 per hour meanBLS May 2025; a wage, not a billing rate

How we got these numbers: Angi's Los Angeles exterior painting cost page (updated November 13, 2025) and the Bureau of Labor Statistics Occupational Employment and Wage Statistics for painters in the Los Angeles, Long Beach and Anaheim metro area (May 2025). Confidence is medium-low because Angi is one publisher and does not state its method. MDG's written proposal for your house is the real price.

  1. Angi, cost to paint a house exterior in Los Angeles (2025)
  2. U.S. Bureau of Labor Statistics, OEWS, painters, Los Angeles-Long Beach-Anaheim (2025)
  3. Dunn-Edwards Evershield Flat product information sheet (coverage and prep) (2024)

Why does a stucco house cost more to paint than wood siding?

Stucco drinks paint and shows every crack. Angi's Los Angeles page says stucco costs more because of specialized prep and paint, without giving a separate rate. The product data sheets explain the mechanics. Dunn-Edwards, the Los Angeles paint maker, lists its Eff-Stop Premium masonry primer at about 225 to 275 square feet per gallon, while its Evershield flat finish coat covers about 400 to 475. A porous wall needs close to twice as much primer per square foot as finish, and heavy texture pushes both numbers down.

Repairs come first. The same primer sheet says masonry surfaces must cure for a minimum of 7 days before priming and that the primer tolerates a surface pH up to 13, which matters on fresh patches. A wall with fresh patches cannot be painted the next morning.

Who does the repair matters too. Painting is the CSLB C-33 classification, which covers preparing surfaces by scraping, sandblasting or other means and applying coatings. Applying stucco is the separate C-35 lathing and plastering classification. Filling hairline cracks is paint prep; rebuilding a wall section is plastering.

A worked example: a 1,800 square foot house, one story or two

Take a 1,800 square foot single-story house in the Valley. At Angi's rates, 1,800 x $2.20 = $3,960 at the low end and 1,800 x $5.90 = $10,620 at the high end. The low figure assumes sound paint and easy access. The high figure means peeling paint, many openings to cut around, and repairs.

Now put the same floor area on two stories. Angi's rule of thumb adds about 50 percent: $3,960 x 1.5 = $5,940 and $10,620 x 1.5 = $15,930.

A material check helps you read a bid. Suppose the walls measure 1,300 square feet after subtracting windows and doors. Primer at the midpoint of 250 square feet per gallon is 1,300 / 250 = 5.2 gallons. Two finish coats at about 437 square feet per gallon is 2,600 / 437 = 6 gallons. A proposal listing two gallons of primer is not priming the whole wall, so ask which areas get it.

What prep work should an exterior paint quote include?

Prep is where two bids for the same house drift thousands of dollars apart. The Evershield data sheet states the standard plainly: surfaces must be cured, clean and dry, loose, peeling or chalky paint must be removed, cracks and holes repaired, and glossy surfaces dulled. Ask each painter to put the method in writing.

  • Washing method, and how long the walls dry before primer.
  • Scraping and sanding of failed paint, with lead-safe methods if the house predates 1978.
  • Crack and hole repair, and the cure time allowed for stucco patches.
  • Primer: product name, and whether it is spot primed or the full wall.
  • Finish coats: product line, sheen, number of coats and color count.
  • Trim, fascia, eaves, doors, garage door and gates, each marked included or excluded.
  • Masking of windows, roof edges and plants, and daily cleanup.

If the house was built before 1978, scraping and sanding fall under the federal lead renovation rule. Our guide to lead paint rules for older homes explains what the painter must do.

Does painting the outside of a house need a permit in Los Angeles?

Painting itself does not. Los Angeles Municipal Code section 91.106.2 lists painting, papering and similar work among the items that need no building permit, with an exception for washing or blasting on upper stories next to a public sidewalk. Our research read that text in a City Clerk council file dated November 2025.

The work around the paint can need one. LADBS Information Bulletin P/GI 2026-003, revised June 10, 2026, lists replacing existing siding with new stucco on a single-family dwelling or duplex as an Express Permit, issued with no plan check. Swapping rotted wood windows before painting has its own rules, covered on our window replacement page. HOA and historic district color approval is a separate question we did not verify. Other cities, such as Pasadena, Long Beach and Glendale, run their own permit counters.

Is labor or paint the bigger part of an exterior painting bill?

Labor, by a wide margin on most houses. The six gallons of finish in the example above is a small line next to the days of washing, scraping, patching, masking and cutting in. The Bureau of Labor Statistics reported a mean wage of $29.71 an hour for painters in the Los Angeles, Long Beach and Anaheim metro area in May 2025, with a median of $28.41. That is a wage, not a billing rate. The billed rate also carries payroll taxes, insurance, equipment and overhead, which is why a cheaper paint rarely saves much.

What should the painting contract and payment schedule look like?

Any home improvement job over $500 needs a written contract under Business and Professions Code section 7159. California caps a deposit at the lesser of $1,000 or 10 percent of the contract price. On Angi's $4,692 average, 10 percent is $469.20, so that is the most a painter may collect before starting. Later payments must track work already done.

MDG Builders, CSLB #1040337, is a general building contractor based in Tarzana. On a painting project we write the scope, handle scheduling and manage the job, and a licensed painting subcontractor does the brush and spray work. You can ask for that subcontractor's license number and certificate of insurance, then check the license yourself.

Timing affects quality more than price, so see our guide to the best season for exterior paint. If fascia boards or eaves are soft, have the roof edge checked before anyone paints over the problem, and on coastal homes in places like Santa Monica look closely at metal railings for rust.

FAQ

Exterior painting cost questions

How much should it cost to paint the exterior of a 1,500 sq ft house?

About $3,300 to $8,850 for a single story in Los Angeles, using Angi's November 2025 rate of $2.20 to $5.90 per square foot of home. A two-story layout adds roughly 50 percent, and stucco repair or heavy scraping pushes a job toward the top.

Is $50 an hour good for a painter?

It is a normal billed rate, not a high wage. The Bureau of Labor Statistics put the mean painter wage in the Los Angeles metro area at $29.71 an hour in May 2025. A contractor's hourly charge also covers payroll taxes, insurance, equipment and overhead.

Do you need a permit to paint the exterior of your house?

No, not for painting alone in the City of Los Angeles. Municipal Code section 91.106.2 lists painting among work that needs no building permit. Replacing stucco, windows or structural wood during the same project can need one.

Is painting stucco a bad idea?

No, painting sound stucco is common and works when the wall is clean, dry, repaired and primed with a masonry primer. Fresh patches need time: one Dunn-Edwards masonry primer sheet requires at least 7 days of cure first.

How many coats of paint does the exterior of a house need?

Most repaints get primer where the surface needs it plus the finish coats the product data sheet calls for to reach its film thickness. A color change, bare patches or chalky old paint add primer or a coat, so have the count written into the contract.

Can a general contractor do painting in California?

A general building contractor can manage a painting job, and the painting trade itself is the CSLB C-33 classification. MDG Builders manages the project and uses a licensed painting subcontractor for the field work. Ask for that subcontractor's license number and verify it with CSLB.

Services

Work that goes with this

Painting by city

Windows by city

Roofing by city

Ready to plan your project?

Call or send the form. We schedule a site visit and send a written proposal.

Call (888) 666-8224