Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Fencing

Fencingin Los Angeles and Southern California

Quick answer

A 6-foot wood or vinyl privacy fence in Los Angeles runs about $25 to $55 per linear foot installed, or roughly $2,500 to $5,500 for 100 feet. The City requires a permit for masonry fences over 3.5 feet. MDG Builders (CSLB #1040337) manages the job, and licensed subcontractors build it.

CSLB #1040337 5.0 on Houzz Free written estimate
Horizontal slat redwood fence with a matching gate along a modern backyard with gravel and grasses, soft sunlight
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work
Permits and height

Do I need a permit to build a fence in Los Angeles?

For most wood, vinyl and metal fences in the City of Los Angeles, no building permit is needed, but zoning height limits always apply. LADBS bulletin P/BC 2026-080 (LABC and LARC section 106.2) requires a permit for masonry or concrete fences over 3.5 feet, for any other fence over 10 feet, and for pool barriers.

Height is a separate question. LADBS bulletin P/ZC 2023-002 allows side and rear yard fences in the A, RA and R zones to reach 8 feet when the lot is at least 40 feet wide and outside the Hillside Area, and 6 feet otherwise. Front yard limits are lower and change with the zone, so confirm the figure for your address first.

Outside the city the rules change: unincorporated county land exempts fences up to 6 feet, and cities such as Calabasas, Agoura Hills and Beverly Hills write their own codes.

The photo shows the next stage: posts set in concrete and braced, with a string line along the tops. Posts belong on the surveyed or agreed boundary, and moving one after the concrete sets is expensive. No survey? Ask for stakes before anyone digs.

Fence posts set in concrete footings and braced, a string line stretched along them, fresh soil, no panels yet
Process

What happens between the first call and a finished fence?

MDG Builders holds the contract and runs the schedule. Licensed subcontractors do the field work, and you can ask for each one's license number and certificate of insurance.

  1. Call and property questionsCall (888) 666-8224 or use the contact form. Give us the length, height, material and whether the line is shared, and mention pools, slopes, an HOA or an existing wall.
  2. Site visit and measuringWe walk the line, note grade changes, trees, meters and gate locations, and photograph both sides.
  3. Written proposalThe scope is in writing: materials, post spacing, gate hardware, removal and the price. California requires a written contract for home improvement work over $500 (Business and Professions Code 7159) and caps the down payment at $1,000 or 10 percent, whichever is less (7159.5).
  4. Permits and neighbor noticeIf a permit applies, we file it. On a shared fence you send the Civil Code 841 notice, and we supply measurements and scope to attach.
  5. Scheduling the licensed subcontractorsA licensed fence contractor builds wood, vinyl, chain-link and metal; a licensed mason builds block. See how general contractors use subcontractors.
  6. Build, walkthrough and punch listWe check the line, gates and cleanup with you before closing the job.
Materials

Wood fence or vinyl fence for a shared backyard line?

The published price ranges for wood and vinyl privacy fencing overlap, so price rarely settles the choice; how each one fails does. The University of California's pest management program says drywood termites are most common in Southern California and infest fences and decks, so wood posts are best kept off bare soil with termite-resistant lumber or concrete footers.

Vinyl gives termites nothing to eat, but its posts still sit in concrete, and the panel system must be approved by its maker for your height. Ask for the manufacturer's installation sheet for a 6-foot fence.

A fence on a shared line adds a legal step. Civil Code section 841 presumes both owners share the reasonable cost equally and calls for 30 days' written notice before you incur costs. The presumption can be rebutted, so keep the notice, the written scope and the quote together.

White vinyl privacy fence section in a suburban backyard with a lawn and a lemon tree
Metal and gates

What does an iron or aluminum fence with a driveway gate involve?

Ornamental iron and aluminum fences keep sight lines open, which suits front yards where height limits are tight. They come as factory panels or as welded custom work. Panels are quicker; custom welding follows slopes and odd openings and is priced from the site visit.

A driveway gate is a separate decision from the fence beside it. Swing gates need clear room to open, sliding gates need a straight run alongside the opening, and either one with an opener needs power, a safety stop and a control such as a keypad. The electrical supply and the opener are their own scope: ask who holds the license for that work and get the number.

We print no price for gates or openers: the only independent figure we found is a wide national range. Width, material, swing or slide, the power run and access control decide it.

Black wrought iron fence and driveway gate in front of a stucco house with palms
Cost

How much does a fence cost per foot in Los Angeles?

Wood and vinyl privacy fencing runs about $25 to $55 per linear foot installed in Los Angeles, based on the overlap of five published sources. Ranges appear only where independent pricing exists; the written proposal sets everything else.

What it coversTypical rangeWhat moves the price
Wood or vinyl privacy fence, 6 feet$25 to $55 per linear footPost spacing and depth, board grade, slope, removal, access
Chain-link$12 to $30 per linear footHeight, wire gauge, privacy slats, gates
Aluminum or ornamental iron$35 to $85 per linear footFactory panels or custom welding, finish, slope
Typical 100-foot backyard run$2,500 to $5,500 totalMaterial, one or two gates, whether removal and a permit are included
Block walls, horizontal slat fences, gates and openers, hillside lotsSet by the written proposalNo independent Los Angeles price found. Reinforcement, footing depth, height, wood grade, hardware and electrical work drive it

How we got these numbers: Angi's Los Angeles fence page (August 2026), Angi's national guide (October 2026, built on 2,968 verified projects), HomeGuide (February 2026), Thumbtack (July 2026) and Fixr (January 2025), read as the overlap for installed 6-foot fencing on a standard lot. They disagree at the low end, so this is a planning range. As a labor check, the Bureau of Labor Statistics put the mean wage of fence erectors in the Los Angeles area at $28.00 an hour in May 2025. Permit fees are not included. Your written proposal from MDG sets the actual price.

  1. Angi, Los Angeles fence cost (2026)
  2. Angi, national fence guide (2026)
  3. HomeGuide fence cost (2026)
  4. Thumbtack fence cost (2026)
  5. Fixr fence cost (2025)
  6. BLS wages, fence erectors (2025)
  7. LADBS P/BC 2026-080 (2026)
  8. LADBS P/ZC 2023-002 (2023)
  9. Civil Code 841 (current)
  10. CSLB C-13 Fencing (current)
Gates and hardware

What should a good fence gate have?

A gate is the one moving part on a fence, so poor work shows there first. Look for a hinge post set larger or deeper than the line posts, hinges sized to the gate's weight, a one-hand latch and a leaf that closes without dragging. The photo shows black strap hinges and a latch of the kind a heavy wood gate needs.

Pool gates follow different rules. In the City of Los Angeles a pool barrier needs a permit under P/BC 2026-080, and a non-masonry pool barrier fence is on the express permit list (P/GI 2026-003, item 29), Health and Safety Code section 115922 requires at least two of seven drowning-prevention features when a permit is issued for a new or remodeled pool, and the enclosure itself must meet section 115923.

Close-up of black gate hinges and a latch on a wooden fence gate
Design and weather

Horizontal slat fences: what changes in cost, wind and HOA approval?

A horizontal slat fence, like the redwood one in the top photo, is a design choice with its own cost drivers: lumber species and grade, long boards that must stay straight between posts, tight post alignment, and the finish. We did not find an independent Los Angeles price for this style, so we do not print one.

Wind is worth a question. The National Weather Service forecast for Los Angeles and Oxnard in October 2026 called for gusts of 35 to 55 miles per hour in the valleys and on the coast, and 50 to 70 in the foothills. Ask how posts are sized, set and spaced for a solid fence.

On a Hillside Area lot in the city, side and rear fences are capped at 6 feet. In an HOA, get approval in writing before ordering: Civil Code section 4765 requires a reasonable procedure, a written decision and a chance at reconsideration.

Timeline

How long does it take to build a fence?

The building is usually short next to the approvals around it: neighbor notice, a permit, an HOA decision and material lead times. Your proposal states the schedule.

  • Before pricing is finalBoundary and approvals checkWe confirm the jurisdiction, height limit, HOA requirements and where the line runs.
  • 30 days' written noticeNeighbor noticeOn a shared line, Civil Code section 841 calls for notice 30 days before costs.
  • Set by the agencyPermit, if one appliesMasonry over 3.5 feet and pool barriers need one in the City of Los Angeles.
  • Concrete sets before panels go onPosts and footingsPosts are set to the string line and braced until the footings can take load.
  • Depends on material and lengthPanels, rails or block coursesWood and vinyl go up fastest; iron needs fitting or welding; block needs time for mortar and grout to set.
  • Last visitGates, hardware and walkthroughWe check plumb, gate swing and latch with you and list fixes before final payment.
Walls

Who builds a block wall: a fence contractor or a mason?

A mason does. CSLB's C-13 fencing class excludes masonry walls, and its C-29 masonry class covers concrete block walls for structures and fences, so MDG schedules a masonry subcontractor for block.

Permits follow the height: the City of Los Angeles requires one above 3.5 feet. A free-standing block fence up to 6 feet outside the required front yard can use an express permit with no plan check (P/GI 2026-003, item 27), and a partly open wall can stay permit-free within the pilaster limits in P/BC 2026-080. Zoning heights still apply.

We do not print a per-foot price for block walls. The one national figure we found looked too low for a reinforced 6-foot wall, and no independent Los Angeles price turned up. Footing depth, steel, grout, height, finish and cap decide it. For walls that hold back soil, see the retaining wall section on our concrete page.

Stucco-covered block wall with a smooth cap and a wooden pedestrian gate, a street tree and a sidewalk
Where we build

Fencing by city

FAQ

Fence questions Los Angeles homeowners ask

How much should a 100-foot fence cost in Los Angeles?

Plan on roughly $2,500 to $5,500 installed for a 100-foot, 6-foot wood or vinyl backyard fence, based on the overlap of Angi, HomeGuide, Thumbtack and Fixr pricing. Gates, slopes, old fence removal and masonry raise it, and the written proposal sets your price.

Do I need a permit to build a fence in LA?

Not for most wood, vinyl or metal fences, but yes for masonry or concrete fences over 3.5 feet and for pool barriers. LADBS bulletin P/BC 2026-080 sets the triggers at 3.5 feet for masonry, 10 feet for other fences, and any pool barrier. Zoning height limits apply regardless.

Can I put up a 7 foot fence?

In the City of Los Angeles, yes in a side or rear yard if the lot is at least 40 feet wide and outside the Hillside Area, where the limit is 8 feet; otherwise it is 6. The state building code (CBC section 105.2) exempts fences up to 7 feet from a building permit, but zoning still controls.

How tall can my front fence be in California?

There is no statewide front-yard height; each city sets its own. In the City of Los Angeles, front-yard limits are lower than the 6 or 8 feet allowed on side and rear yards and depend on the zone. Read LADBS bulletin P/ZC 2023-002 before you order.

Does my neighbor have to pay for half the fence in California?

Usually the two owners are presumed to share the reasonable cost equally, though the presumption can be rebutted. Civil Code section 841 calls for written notice 30 days before you incur costs.

A neighbor put up a 9 foot fence. Can I do anything?

Check the zoning height first. In the City of Los Angeles, side and rear fences top out at 8 feet, so a 9-foot fence there may violate zoning and can be reported to LADBS. Civil Code section 841.4 separately treats a malicious, unnecessary fence over 10 feet as a private nuisance.

Do you need a permit to build a block wall in California?

In the City of Los Angeles, yes for any masonry or concrete fence over 3.5 feet, except partly open walls up to 6 feet that meet the pilaster, solid-section and open-top limits in LADBS bulletin P/BC 2026-080. Other cities use their own thresholds.

Is it cheaper to install a wood fence or a vinyl fence?

Not reliably, because published Los Angeles-area ranges overlap and both fit our $25 to $55 per foot planning range. Board grade, height and site conditions matter more than the material. Ask for both priced for the same footage, height and post spacing.

Is it more expensive to build a horizontal fence?

Expect a horizontal slat fence to be quoted higher than a basic vertical one, but no independent source gives a Los Angeles number, so we print none. Lumber grade, framing that keeps long boards straight, finish and post spacing drive it.

What are the new fence rules in California in 2026?

No new statewide fence height rule turned up in our review. On January 1, 2026, LADBS bulletin P/BC 2026-080 took effect and Business and Professions Code 7048 was amended on when a license is required. For wildfire rules at your address, ask your building department.

How do I choose a reputable fence company in Los Angeles?

Verify the license on the CSLB website, confirm the class and read the written contract before paying. Fence work falls under C-13 and block walls under C-29. MDG Builders holds CSLB #1040337 and hires licensed subcontractors; see how to check a contractor's license.

Is my fence estimate at market rate?

Divide the total by the linear feet and compare it with $25 to $55 per foot for 6-foot wood or vinyl, then see what is included. Demolition, a permit, gates or a slope can honestly sit above that range, but a quote with no line items cannot be compared at all.

Free estimate

Get a written fence proposal

Send the length, height and material. We check the height and permit rules for your address before quoting.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224