Roofingin Los Angeles and Southern California
A typical Los Angeles asphalt shingle roof costs about $10,000 to $25,000, per Angi's July 2026 data, and tile and metal cost more per square foot. Most re-roofs qualify for a LADBS Express Permit with no plan check. Fire zones require Class A, and replacing over half the roof brings the cool roof rule.

How do I know whether my roof needs a repair or a full replacement?
A repair fixes a defined problem: a cracked flashing, a failed vent boot, a handful of slipped or missing shingles. Replacement makes sense when the problem is the whole surface: shingles curling or shedding granules across several slopes, leaks in more than one place, or soft decking found once a repair is opened up. The only reliable answer comes from an attic and roof inspection, not a look from the street.
A shingle replacement runs in a fixed order. The old covering is torn off to bare sheathing, soft decking is replaced, synthetic underlayment goes down, metal drip edge is set at the eaves, flashing is installed at every wall, valley and penetration, and the new shingles are nailed on. Angi's Los Angeles page lists tear-off alone at $1,000 to $3,000.
Wood shakes are out of the picture. The LADBS fire-zone checklist bars wood shake and wood shingle coverings, even fire-retardant treated ones, and Angi notes they are not permitted in Los Angeles.

How much does a new roof cost in Los Angeles?
Size, pitch and material set the price, and the two best public sources differ by about two to one because they measure different things. Remodeling magazine prices one fixed reference roof, while Angi averages real jobs of every size.
| What it covers | Typical range | What moves the price |
|---|---|---|
| Asphalt shingle, typical single-family roof | $10,000 to $25,000 | Angi Los Angeles, July 2026: average $17,271, about $8.60 per sq ft, with asphalt at $4 to $12 per sq ft. Roof size, steepness and decking repair move it. |
| Concrete or clay tile | $7 to $15 per sq ft | Angi Los Angeles, July 2026. A reset on new underlayment costs less than new tile; flashing and cut tile add labor. |
| Metal | $7 to $16 per sq ft | Angi Los Angeles, July 2026. Panel profile and the number of roof planes drive the total. |
| Remodeling Cost vs. Value 2025, Los Angeles | Asphalt $36,417; metal $62,069 | Itemized estimates for one reference roof whose size is not published. Resale value was $26,804 for asphalt (73.6 percent recouped) and 48.7 percent for metal. |
| Extras | Tear-off $1,000 to $3,000; solar detach and reset $500 to $1,000 | Angi Los Angeles, July 2026. Rotted decking found after tear-off is priced when found, so ask how the proposal handles it. |
How we got these numbers: Angi's July 2026 Los Angeles page surveys real customers about what they paid; Remodeling magazine's Cost vs. Value report (September 2025) uses itemized estimates for a reference roof plus a Realtor survey. We did not use contractor marketing pages. Confidence is medium to low, since the two sources use different roof sizes. MDG's written proposal, based on a measured roof, is the real price.
Can a tile roof be reset or repaired instead of replaced?
Often, yes. Concrete and clay tile usually outlast the underlayment beneath them, so the failed part is typically the layer under the tile, not the tile. LADBS recognizes this. Item 23 of LADBS Information Bulletin P/GI 2026-003 covers resetting existing tile on new underlayment, and that item carries no cool roof requirement.
The weak points on a tile roof are the cut tiles beside walls and vents and the metal flashing along them. A good reset replaces broken tiles and renews that flashing, not just the felt. If you are switching from shingles to tile, ask whether the framing needs an engineer's check, since tile weighs more than shingle.

Where do roofs actually leak?
Most leaks start where the roof surface is interrupted, not in the open field of shingles. The usual suspects are valleys, wall junctions, chimneys, skylights and plumbing vents. The rubber boot around a vent pipe is one of the first parts to age in the sun, and replacing it during a re-roof is routine.
In a valley, metal flashing sits under the shingles on both sides, and the shingles are cut cleanly along its edge. Ask any roofer whether the proposal replaces or reuses flashing and vent boots; it should say so in writing. Skylights in fire zones need tempered glass layers, per item 9 of the LADBS fire-zone checklist.

What should a roofing contract in California include, and who needs a license?
Roofing is licensed as CSLB classification C-39, which covers installing products that seal, waterproof and weatherproof a structure, from shingles and tile to metal and membranes. MDG holds CSLB #1040337 as a general contractor. We do not install roofs ourselves: we hire a C-39 roofer, pull the permit and manage the work. Any license can be checked at cslb.ca.gov.
Business and Professions Code 7159, amended in 2026, sets the floor for any home improvement contract over $500:
- The contract is in writing and signed before work starts, with a contract price, a description of the work and materials, and start and completion dates.
- The down payment cannot exceed $1,000 or 10 percent of the price, whichever is less.
- Payments follow work actually completed. The statute says it is against the law to collect payment for work not yet done.
- Changes are agreed in writing, and a lien release comes with each payment.
- A checkbox states whether subcontractors will be used, with the list available on request.
- You can cancel within 3 business days (5 for seniors), or within 7 days for disaster repair.
What does the Los Angeles building code require for a new roof?
In the City of Los Angeles, a re-roof with a Class A or B covering under 6 lb per sq ft, over existing solid sheathing or new sheathing, is an Express Permit with no plan check (LADBS Information Bulletin P/GI 2026-003, revised June 10, 2026). The covering, underlayment, drip edge and deck together form the roof assembly that gets rated.
Cool roof: when more than 50 percent of a house's roof area is replaced, the new covering must be a Cool Roof Rating Council labeled and certified product. Roof coating and attic radiant barrier work are also express items.
Fire zones: the LADBS fire hazard severity zone checklist, based on the 2025 California Wildland-Urban Interface Code, requires a Class A roof assembly rated under ASTM E108 or UL 790. Some masonry, clay and concrete tile on noncombustible decks, and metal, are treated as equivalent. A covering that is replaced, or 50 percent or more replaced within 12 months, must meet the new-construction roof rules.
CAL FIRE released recommended 2025 fire hazard maps on March 24, 2025, and the City must adopt them by ordinance, so more parcels may land in zones. We confirm your parcel and whether the checklist applies to a roof-only job with LADBS before quoting a material. Other cities have their own departments and permit paths.

How long does a roof replacement take?
These are MDG's planning ranges for a single-family house, not independent data. The written proposal states the real start and completion dates, as the contract statute requires.
- 1 to 2 weeksInspection and proposalRoof and attic inspection, measurements, and a written scope with the material and its fire rating.
- Express, no plan checkPermitEligible re-roofs in the City of Los Angeles skip plan check. Other cities set their own timing.
- 1 to 3 weeksMaterial order and schedulingMaterial is ordered and the roofer is booked around forecast rain.
- 1 to 2 daysTear-off and dry-inThe old covering comes off and the roof is closed with underlayment the same day where possible.
- 2 to 7 daysCovering and flashingShingles, tile or metal are installed with flashing, vents and ridge.
- Same weekInspection and walkthroughAny permit inspection, then a final look at flashing, gutters and cleanup.
What happens with solar panels, gutters and the final inspection?
Solar panels usually have to come off and go back on for a re-roof. Angi puts the detach and reset at $500 to $1,000 in Los Angeles. A solar installer handles the electrical side, so book that visit around the roofing dates.
New fascia board and drip edge go on before the covering, and gutters are replaced or reattached afterward. The last step is any inspection the permit calls for, then a walkthrough where we check flashing, vents and cleanup together.
On value, Remodeling magazine's 2025 Cost vs. Value report for Los Angeles shows 73.6 percent of an asphalt shingle roof's cost returned at resale, against 48.7 percent for metal.

How does a roofing job run with MDG Builders?
MDG is a general contractor (CSLB #1040337) that manages the project. A licensed roofing subcontractor does the work on your roof, and you may ask for that firm's license and certificate of insurance before it starts.
- Call and address checkWe look up your fire zone and the roof's age and type before anyone climbs a ladder.
- Roof inspectionWe look at decking, flashing, vents and the attic underside, and photograph what we find.
- Written proposalIt names the material, fire rating, flashing and vent replacement, tear-off, the price, and the dates.
- PermitWe file the Express Permit or the local equivalent and arrange the cool roof or Class A documentation.
- Ordering and schedulingMaterial is ordered, solar work is booked if needed, and the roofer is scheduled around the weather.
- Tear-off and installationThe roofer works from bare sheathing up, and we check progress and any decking surprises with you.
- Final inspection and walkthroughWe confirm the permit is closed and walk the finished roof and gutters with you.
Roofing by city
Projects that often go with roofing

Windows
Replacement windows and sliding doors, with the LADBS permit path, glass ratings and sourced prices explained.
See window replacement →
Painting
Interior, exterior, stucco and cabinet painting with real prep, lead-safe rules followed and a written scope.
See painting →
Room Additions
Family rooms, primary suites and second stories, from zoning check to final inspection, with sourced prices.
See room additions →Roofing guides and answers

How Much Does a Roof Replacement Cost in Los Angeles?
Per-square-foot roof prices for Los Angeles with sources, a worked example by roof size, and the permit, fire-zone and contract rules.
Read the guide →
How to Check a Contractor's License in California
Read a CSLB license record line by line, learn what a B license means, and see MDG's own record as a worked example.
Read the guide →
How General Contractors Use Subcontractors
Why most general contractors hire specialists for the field work, what that means for you, and what to ask for in writing.
Read the guide →Roofing questions in Los Angeles
Do I need a permit to replace my roof in Los Angeles?
Yes. In the City of Los Angeles a re-roof needs a permit, and most qualify as an Express Permit with no plan check under LADBS Information Bulletin P/GI 2026-003. Other cities run their own permit rules, so we confirm with the building department for your address.
How much does a new roof cost in Southern California?
Angi's July 2026 Los Angeles data gives a typical range of $10,256 to $24,963 for a re-roof, averaging $17,271. Tile and metal run $7 to $16 per square foot. Remodeling magazine's 2025 study of one larger reference roof priced asphalt at $36,417.
How long does a roof replacement take, and can I stay home?
Most single-family roofs take a few days on site, and you can generally stay home. Expect noise, falling debris near the walls and a driveway full of material. Pets and anyone sleeping during the day are the usual reasons to leave.
What is a Class A roof, and do I need one?
Class A is the highest fire-resistance rating for a roof assembly, tested under ASTM E108 or UL 790. LADBS requires it in a Very High Fire Hazard Severity Zone, and its fire-zone checklist treats some tile and metal roofs as equivalent. Outside a zone, it is a choice.
What is a cool roof, and does my house need one?
A cool roof uses a covering with a Cool Roof Rating Council rating that reflects more sunlight. In Los Angeles, replacing more than 50 percent of a house's roof area requires a CRRC-certified product. Resetting existing tile on new underlayment is exempt.
Can a general contractor do roofing in California?
Roofing is its own license class, C-39. MDG is licensed as a general contractor (B) with a synthetic products classification (C-61/D12), so we hire C-39 roofers for the work and manage them. Whether a general contractor may self-perform roofing depends on the contract, so we do not rely on it.
How much should you pay a roofing contractor up front?
At most $1,000 or 10 percent of the contract price, whichever is less. That is the California cap in Business and Professions Code 7159. Later payments must match work completed, so a contractor asking for half the price before starting is breaking the rule.
What is the 25 percent rule for roof repairs?
We could not find it in the LADBS bulletins or the state law we reviewed. Contractors and insurers sometimes quote it, but no source we read supports it. If someone cites a percentage rule to you, ask for the written code section.
Can you have a metal roof in California?
Yes. Metal is a listed roofing material under the CSLB C-39 classification, and the LADBS fire-zone checklist treats some metal roofs as equivalent to Class A. It costs more, at $7 to $16 per square foot from Angi, and recoups less at resale.
Does a new roof increase my home's value?
Somewhat. Remodeling magazine's 2025 Cost vs. Value report for Los Angeles shows 73.6 percent of an asphalt shingle roof's cost recovered at resale. The report measures resale only, not the avoided cost of water damage.
How do I check a roofing contractor's license?
Search the license number at cslb.ca.gov, confirm the status is active and look for classification C-39 for roofing. Also check the bond. MDG's own record shows CSLB #1040337, with classifications B and C-61/D12.