Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
What we build

Remodeling and construction services in Southern California

Quick answer

MDG Builders offers twelve services: kitchens, bathrooms, ADUs, room additions, roofing, windows, flooring, painting, concrete, decks, fencing and microcement. MDG designs, permits and manages each job as a licensed general contractor, CSLB #1040337, and licensed subcontractors perform the trade work.

All services

Which services does MDG Builders offer?

Each service below has its own page with a sourced cost range, a realistic timeline, the permits involved and the questions people ask before they hire. Read the one that matches your project, then follow its links to the longer guides.

Finished bright kitchen in a California home: white shaker cabinets, quartz island with waterfall edge, three pendant lights

Kitchen Remodeling

Cabinets, counters, layout changes, permits and a written schedule, with prices tied to named sources.

See kitchen remodeling →
Primary bathroom: freestanding white tub, frameless glass walk-in shower with large-format stone-look tile, double floating oak vanity

Bathroom Remodeling

Showers, tubs, vanities and full baths, with the permit path, waterproofing and prices from named sources.

See bathroom remodeling →
A backyard accessory dwelling unit: white board-and-batten cottage with a black-framed window and a small wood deck

ADU Construction

Garage conversions, detached ADUs and JADUs, with the 2026 permit clocks, utilities and sourced costs explained.

See ADU construction →
A single-story stucco California home with a new addition whose roofline, stucco and windows match the original, blue sky

Room Additions

Family rooms, primary suites and second stories, from zoning check to final inspection, with sourced prices.

See room additions →
Barrel clay tile roof on a Spanish-style California house with white stucco walls and an arched entry, strong sun, palm tree

Roofing

Shingle, tile and metal roofs with LADBS permit rules, fire-zone requirements and sourced costs.

See roofing →
Living room with new large white vinyl windows and a sliding glass door, bright natural light, hills visible outside, light sofa

Windows

Replacement windows and sliding doors, with the LADBS permit path, glass ratings and sourced prices explained.

See window replacement →
Wide-plank natural oak floor in a bright living room with a white sofa and a large window, daylight raking across the boards

Flooring

Hardwood, engineered wood, vinyl plank, laminate and tile, with slab testing and a written scope.

See flooring →
Exterior of a California Craftsman bungalow freshly painted warm white with dark charcoal trim and a deep green front door, wide front porch

Painting

Interior, exterior, stucco and cabinet painting with real prep, lead-safe rules followed and a written scope.

See painting →
New broom-finished concrete driveway and a curved walkway to the front door of a California house, clean control joints, fresh landscaping

Concrete

Patios, driveways, walkways and retaining walls, poured by licensed specialists and priced from sources.

See concrete work →
Raised composite deck with a cable railing and outdoor dining set on a hillside lot, canyon view, golden afternoon light

Decks

Wood and composite decks, hillside decks and stairs, with permits and code checked before framing.

See deck building →
Horizontal slat redwood fence with a matching gate along a modern backyard with gravel and grasses, soft sunlight

Fencing

Wood, vinyl, iron and block fences with the permit and height rules checked first.

See fencing →
Seamless warm gray microcement walls and floor in a walk-in shower with a black rain shower head and a built-in bench, no grout lines

Microcement

Continuous cement-based finishes for floors, walls, counters and showers, with the prep and waterproofing explained.

See microcement →
Method

Why can one company manage roofing, fencing and a kitchen?

Because MDG manages the work and does not perform it. The company holds a General Building license, CSLB #1040337, plus a Synthetic Products classification, and it brings in a licensed specialist for each trade. The roofer holds a roofing license, the electrician an electrical license, the tile setter a tile license.

The benefit to you is structure. One written proposal covers the whole scope, one schedule puts the trades in order, and one office answers questions. Without that, a homeowner ends up coordinating a plumber who cannot start until the framer finishes and an inspector who must see the work before drywall goes up.

Ask for each subcontractor's license number and certificate of insurance. You can confirm a license yourself in a minute on the CSLB lookup at cslb.ca.gov, and you should do it for any contractor you consider, including us.

  • Kitchens, bathrooms and flooring are interior jobs that usually share one schedule.
  • ADUs, additions, concrete and decks involve footings, framing and inspections.
  • Roofing, windows, painting and fencing are exterior jobs that depend on weather and access.
  • Microcement is a specialty surface finish applied by a specialty installer.
FAQ

Questions about the services

Can I combine several trades in one project?

Yes. Putting a kitchen, new flooring and painting under one proposal, or an addition with new windows, gives you a single schedule in which each trade follows the one before it. It also means one permit conversation instead of several. Tell us everything you are considering at the first call.

Which service should I read first if I am not sure what I need?

Start with the page for the result you can describe, such as a new kitchen or a rental unit in the backyard, and follow its links. If the project crosses trades, for example a garage that becomes a living space, begin with ADU construction, since that route carries the most rules.

Do all twelve services need a permit?

No. Painting and swapping one floor covering for another usually do not, while ADUs, additions, re-roofs, structural changes and most plumbing or electrical moves do. The rule differs by city, so confirm with the local building department or ask us at the site visit.

How can I confirm a subcontractor is licensed?

Ask MDG for the license number, then enter it at cslb.ca.gov. The record shows the classification, whether the license is active, and the bond. We can also provide each subcontractor's certificate of insurance on request.

Where do the price ranges on each service page come from?

From named public sources, such as Remodeling magazine's Cost vs. Value report for Los Angeles, government fee schedules and published cost studies. Each page lists its sources with the year. Where a trade has no independent source, the page explains what drives the price and prints no figure.

Is a range on the page a quote?

No. A range is an average for a region and a year. A quote comes only in a written, signed proposal after we have seen your property, and it is the single price we stand behind.

Free estimate

Not sure which service fits?

Describe what you want changed. We will tell you which trades are involved and set up a visit.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224