Can You Rent Out an ADU in California? Owner Occupancy and Short-Term Rules
Yes, you can rent out an ADU in California without living on the property. Government Code section 66315 bars cities from adding an owner-occupancy rule to an ADU, though they may require rental terms of 30 days or longer. Junior ADUs with shared bathrooms still need an owner on site, and short-term rentals depend on your city.
Do you have to live on the property to rent out an ADU in California?
No. Government Code section 66315 says a local agency may not impose standards beyond those in the state ADU law, and it names an owner-occupant requirement as one a city cannot add. You can live in the main house and rent the ADU, live in the ADU and rent the house, or rent both and live elsewhere.
The same chapter says an ADU may be rented separately from the primary residence but may not be sold or conveyed apart from it, with narrow exceptions. One exception is a local condominium ordinance under section 66342, which a city may choose to adopt. It requires every lienholder's consent before a condominium plan is recorded, so even where it exists it is not a quick exit.
What is the shortest lease allowed for an ADU?
State law draws the line at 30 days, in two different ways. For an ADU approved under a city's own ordinance, section 66315 says the agency may require that the property be used for rentals of terms 30 days or longer. For the state-protected types in section 66323, such as a conversion inside an existing house or garage or a detached unit of up to 800 square feet, the agency shall require a term longer than 30 days.
So for the most common ADUs, including most garage conversions, nightly and weekly stays are off the table by state law, whatever the city's short-term rental program says.
Can you rent an ADU on Airbnb in Los Angeles or San Diego?
In the City of Los Angeles, almost never. The Home-Sharing Ordinance, Ordinance 185,931, effective July 1, 2019, allows short-term rental only as an accessory use of the host's primary residence, defined as the home where the host lives more than six months of the calendar year, and caps it at 120 days a year without an extended registration. It then says an ADU whose building permit application was filed on or after January 1, 2017 may not be used for home-sharing unless the ADU is the applicant's own primary residence. Units under the Rent Stabilization Ordinance are not eligible at all.
The City of San Diego is just as direct. Its Short-Term Residential Occupancy FAQ says the Municipal Code prohibits using ADUs for short-term rental, and that only permitted companion units that existed before the September 2017 prohibition may be used that way. San Diego counts any stay under one month as short-term.
Other cities write their own rules, so read your city's short-term rental page before you count on visitor income. Our Los Angeles ADU construction and San Diego ADU construction pages name each building department.
Does rent control apply to an ADU in Los Angeles?
It can, and it can reach the main house too. The Los Angeles Housing Department's ADU page explains that the Rent Stabilization Ordinance generally covers rental units built on or before October 1, 1978, unless there is only one single-family dwelling on the parcel. Adding an ADU ends that single-dwelling status. The department gives four scenarios:
- Detached ADU: the ADU is generally not under the ordinance, but a house built on or before October 1, 1978 may become subject to it because a second unit now shares the parcel.
- New ADU attached to a pre-1978 house: only the original house is subject to rent stabilization. The ADU falls under the Just Cause Ordinance, which regulates evictions and requires registration but does not limit rent increases.
- ADU carved from habitable space of a pre-1978 house: both units may be subject to rent stabilization.
- ADU converted from non-habitable space of that house: the new unit is under the Just Cause Ordinance only.
The department also notes that a property with two or more units, where at least one is rented, comes under the Los Angeles Housing Code and its inspections.
Does the statewide rent cap cover a new ADU?
Not at first. Civil Code section 1947.12 limits yearly rent increases to 5 percent plus the change in the cost of living, or 10 percent, whichever is lower. It exempts housing that received a certificate of occupancy within the previous 15 years, which covers a newly built ADU for its first 15 years.
The main house is a separate question. The statute's single-family exemption applies to property that can be sold separately from any other dwelling unit, with a written notice to the tenant, and its owner-occupied duplex exemption excludes properties where either unit is an ADU or junior ADU. Whether your house keeps an exemption after you add an ADU is a question for a landlord-tenant attorney, not a contractor.
A worked example: renting an attached ADU behind a 1962 Los Angeles house
Say you own a 1962 house in the Valley, build a new attached ADU and receive its certificate of occupancy in 2027. Walk through the rulebooks in order, before you set a rent or sign a lease.
Owner occupancy: none required. Lease term: longer than 30 days. Home-sharing: the ADU was permitted after 2017, so it qualifies only if you move into it yourself, and then for 120 of 365 days, about 33 percent of the year. Local rent rules: under the Housing Department's second scenario, the house is under rent stabilization once it is rented and the ADU is under Just Cause. The department lists annual registration fees of $38.75 per rent-stabilized unit and $31.05 per Just Cause unit, so $38.75 + $31.05 = $69.80 a year if you rent both. State rent cap: the ADU is exempt until 2027 + 15 = 2042.
How are the rules different for a JADU or an SB 9 unit?
A junior ADU, the unit of up to 500 square feet inside the house, has one rule a full ADU does not. Under section 66333, if the JADU shares a bathroom with the house, the owner must live in either the house or the JADU. With its own bathroom, no owner occupancy is required. Either way it carries a deed restriction against separate sale and a rental term longer than 30 days. Our ADU vs JADU comparison covers the efficiency kitchen and size limits, and a JADU often pairs with a kitchen remodel in the main house.
Homes built under SB 9 are primary units, not ADUs, but the rental floor matches: longer than 30 days. A lot split under that law adds a three-year owner-occupancy affidavit, described in our guide to SB 9 lot split and duplex rules.
What should you settle before building an ADU to rent?
Rental plans change the design, so decide them before drawings start. MDG Builders, CSLB #1040337, manages ADU construction as a general contractor: we handle design coordination, permits and scheduling, and licensed subcontractors perform the trade work, with license numbers and insurance certificates available on request. The questions below are for you, your lender and, where noted, an attorney.
- Which type of ADU is it under state law, and does the 30-day minimum apply as a must or a may?
- Was the main house built on or before October 1, 1978, and will adding a unit change its rent status?
- Does your city allow any short-term use of an ADU, or none?
- Will a lender count the future rent? Our guide to ADU financing options covers that.
- Are the finishes chosen for tenants, such as durable flooring and a separate electrical panel?
- Does the budget hold without the rent? See ADU cost in California.
ADU rental questions
Do I need to live on the property to build or rent an ADU?
No. Government Code section 66315 lists an owner-occupant requirement among the standards a city may not impose on an ADU. You can rent the ADU, the main house or both. The exception is a junior ADU that shares a bathroom with the house, where the owner must live in one of the two.
Can I rent my ADU on Airbnb or only for long-term rentals?
Plan on long-term only. State law requires terms longer than 30 days for the state-protected ADU types and lets cities require it for the rest. Los Angeles bars home-sharing in ADUs permitted since 2017 unless the ADU is your primary residence, and San Diego prohibits short-term rental of ADUs.
Can I rent out my garage conversion ADU?
Yes, once it has a permit and final approval as an ADU. A garage converted under section 66323 must be rented for terms longer than 30 days, and no owner occupancy is required. In Los Angeles, check with the Housing Department whether the conversion places the house or the ADU under rent stabilization or Just Cause rules.
Is an ADU subject to rent control in Los Angeles?
Usually the new ADU itself is not under the Rent Stabilization Ordinance, but the Housing Department says a house built on or before October 1, 1978 can become subject to it once a second unit is added. It places a new attached ADU under the Just Cause Ordinance, which covers evictions and registration.
Can I rent my ADU to a family member?
Yes. Nothing in the state ADU law limits who the tenant is. In Los Angeles, the Housing Department says rent-stabilized units occupied by the landlord or family members, or where no rent is collected, can receive a temporary one-year exemption from registration fees, which must be requested again each year.
Can I live in my ADU and rent out the main house?
Yes. Because state law bars an owner-occupancy requirement for an ADU, you may live in either unit or in neither. In Los Angeles, check first whether renting a house built on or before October 1, 1978 on a parcel with an ADU places it under the Rent Stabilization Ordinance.
Work that goes with this

ADU Construction
Garage conversions, detached ADUs and JADUs, with the 2026 permit clocks, utilities and sourced costs explained.
See ADU construction →
Kitchen Remodeling
Cabinets, counters, layout changes, permits and a written schedule, with prices tied to named sources.
See kitchen remodeling →
Flooring
Hardwood, engineered wood, vinyl plank, laminate and tile, with slab testing and a written scope.
See flooring →Keep reading

ADU vs JADU in California: What Is the Difference?
Size, kitchen, owner occupancy, rent rules and parking: how a junior ADU differs from a full ADU under current state law.
Read the guide →How Do You Pay for an ADU in California?
Cash, HELOC, cash-out refinance, renovation mortgages and local loans, plus how lenders count ADU rent and where the state grant stands.
Read the guide →SB 9 Lot Splits and Duplexes in Southern California: What Is Allowed?
What SB 9 lets a single-family lot owner build or split, who qualifies, the 40 percent rule, fire-zone limits and Los Angeles practice.
Read the guide →Ready to plan your project?
Call or send the form. We schedule a site visit and send a written proposal.