How to Read a Remodeling Contract in California, Page by Page

Quick answer

Read a California remodeling contract by matching it against the headings that Business and Professions Code section 7159 requires: Contract Price, Downpayment, Schedule of Progress Payments, Approximate Start Date, Approximate Completion Date, and the note about change orders. If a required heading or notice is missing, ask why before you sign anything.

By MDG Builders · November 9, 2026

missing photo

What makes a home improvement contract legal in California?

One statute does most of the work. Business and Professions Code section 7159, last amended by Senate Bill 517 effective January 1, 2026, applies to any home improvement contract whose total price for labor, services and materials is more than $500. The contract and every later change must be in writing and signed by both sides before the work it covers begins.

Before any work starts, the contractor must hand you a copy signed and dated by both of you. Receiving it starts your right to cancel. A missing notice or disclosure is cause for discipline against the contractor, which is why careful paperwork runs long. The same rules cover a kitchen remodel, a roof or a fence.

What should you find on the first page?

Start at the top and tick these off. The statute puts several of them on page one so you cannot miss them.

  • The contractor's name, business address and license number. Check the number on the CSLB site using our guide to checking a contractor's license.
  • The heading Home Improvement, in bold type.
  • The date you signed.
  • The name, address and email address where a Notice of Cancellation can be sent, and a telephone number for help filling it out.
  • If a salesperson sold you the job, that person's name and CSLB registration number.
  • A bold statement that you are entitled to a completely filled in copy, signed by both of you, before any work may be started.

How do you read the price and down payment lines?

Look for the heading Contract Price followed by one number in dollars and cents. Under section 7159.5 that number is the entire cost, including profit, labor and materials. If the contractor is financing the job, a Finance Charge heading shows that amount separately.

Next comes the heading Downpayment, a space with the amount, and a sentence in capital letters saying the downpayment may not exceed $1,000 or 10 percent of the contract price, whichever is less. On a $48,000 kitchen, 10 percent is $4,800, so the cap is $1,000. On a $7,200 bathroom refresh, 10 percent is $720, so the cap is $720. Any contract of $10,000 or more has the same $1,000 ceiling.

The one exception is a contractor with a bond on file covering full performance and payment, which the CSLB says only about two dozen licensees hold.

What does a legal schedule of progress payments look like?

After the down payment, every payment before completion must appear under the heading Schedule of Progress Payments. Each one is stated in dollars and cents and tied to specific work, services, materials or equipment. The section must also carry a bold statement that it is against the law for a contractor to collect payment for work not yet completed, or for materials not yet delivered.

Here is an illustration for that $48,000 kitchen. The stages and amounts are invented to show the form: $1,000 down payment at signing. $9,000 when demolition and rough plumbing and electrical are complete. $14,000 when cabinets are delivered and installed. $12,000 when countertops and tile are in. $8,000 when fixtures, appliances and paint are done. $4,000 after the final inspection and walkthrough. Add them: 1,000 + 9,000 + 14,000 + 12,000 + 8,000 + 4,000 = 48,000.

Two tests apply to any schedule. First, the payments must add up to the contract price exactly. Second, under section 7159.5 no payment other than the down payment may exceed the value of the work performed or material delivered at that point. A schedule that asks for half the price when cabinets are merely ordered fails the second test.

If a payment line names a date but no finished work, ask for it to be rewritten around a milestone you can see.

Where are the start and completion dates, and what is substantial commencement?

The contract needs three things here: the heading Approximate Start Date with a date, the heading Approximate Completion Date with a date, and a sentence describing what counts as substantial commencement of work. It answers whether dropping off a dumpster counts as starting. A clear version names a real event, such as demolition beginning or the first rough inspection being scheduled.

Permits affect these dates. A room addition waiting on plan review in Glendale or Torrance should say whether the start date is counted from signing or from permit issuance. The CSLB also advises writing down who is responsible for obtaining the permits.

How do change orders work once the job is under way?

Every contract must include the heading Note About Extra Work and Change Orders. The rule under it is simple. A change becomes part of the contract only when it is written down and signed by both of you before that work starts. The order has to state three things: the scope of the extra work or change, the amount added to or subtracted from the price, and the effect on the progress payments or the completion date.

A separate notice adds that you cannot require a contractor to do extra work without written authorization, and extra work is not enforceable against you unless those three items were in writing first. The statute adds a caution: a contractor who skips the paperwork may still seek payment in court on unjust enrichment grounds.

Run the numbers on each one. If opening a wall reveals old galvanized pipe and replacing it adds $2,350, the order should show the new contract price, $48,000 + $2,350 = $50,350, which payment line absorbs the $2,350, and whether the completion date moves.

Which notices come with the contract, and what does each tell you?

The back pages are where the consumer protections sit. Read each as an answer to a question.

  • Commercial General Liability Insurance: whether the contractor carries it and with which insurer, so you can call and confirm.
  • Workers' Compensation Insurance: either the contractor has no employees and is exempt, or all employees are covered.
  • Subcontractor checkbox: Yes or No. If Yes, a required sentence says a list of subcontractors with names, contact information, license numbers and classifications is available on request.
  • Mechanics Lien Warning: unpaid subcontractors and suppliers can record a lien on your home even if you paid the contractor. Our guide to lien release forms covers the defense.
  • Lien release statement: after you pay for a portion of the work, the contractor must furnish a full and unconditional release for it before any further payment.
  • Information about the CSLB, including the usual four-year complaint deadline.
  • Right to cancel: three business days, five for a senior citizen, seven for repairs after a declared disaster, with a detachable Notice of Cancellation form.
  • Near the signatures: a notice that you may require a performance and payment bond.

What should you do in the last ten minutes before signing?

Compare the project description against what was promised out loud. The statute requires a heading for the description of the project and of the significant materials and equipment. The CSLB's advice is to make it specific by brand, model, color, size and quantity, to get any verbal promise written in, and never to sign a blank or partly blank contract. Attached drawings belong under the heading List of Documents to be Incorporated into the Contract.

MDG Builders, CSLB #1040337, is a general contractor that draws up the scope, pulls the permits and coordinates the trades, and the trade work itself goes to licensed subcontractors. On our contracts the subcontractor box reads Yes and the workers' compensation notice reads no employees, exempt. Ask us for the subcontractor list. The same request is fair to make of anyone bidding your bathroom or ADU, and our list of contract red flags covers evasive answers. This page explains the statute in plain words and is not legal advice.

FAQ

Remodeling contract questions

What must a home improvement contract include in California?

It must include the contractor's name, address and license number, the contract price, a description of the project and significant materials, the down payment and progress payment schedule, approximate start and completion dates, a change order note and a set of notices. Business and Professions Code section 7159 lists them.

Is a verbal agreement with a contractor binding in California?

Do not count on it. Section 7159 requires home improvement contracts over $500 to be in writing and signed before work begins, and the CSLB lists a contractor who says a written contract is unnecessary among its scam signs. Get every promise added to the document.

Can a contractor charge more than the contract price?

Only through a written change order signed by both of you before the extra work starts. The order must state the scope, the amount added or subtracted, and the effect on payments or the completion date.

What is a progress payment in a construction contract?

A progress payment is any payment after the down payment and before completion. California law requires each one to be listed in dollars and cents and tied to specific work or materials, so a contractor may not collect for work not yet done.

Do change orders have to be in writing in California?

Yes. Section 7159 says a change order becomes part of the contract only when it is in writing and signed by the parties before the work it covers begins. If subcontractors are used, each change order repeats the subcontractor disclosure sentence.

What does the Yes or No subcontractor box on my contract mean?

It tells you whether subcontractors will work on your project. If Yes is checked, the contract must say that a list of subcontractors, with names, contact information, license numbers and classifications, will be provided when you ask. Look up each license on the CSLB site.

Services

Work that goes with this

Kitchen Remodeling by city

Bathroom Remodeling by city

Room Additions by city

Ready to plan your project?

Call or send the form. We schedule a site visit and send a written proposal.

Call (888) 666-8224