Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Window safety

Egress Window Requirements in California: Bedroom and Basement Sizes

Quick answer

A California egress window needs a net clear opening of at least 5.7 square feet, or 5 square feet on a grade floor, at least 24 inches high and 20 inches wide, with the bottom of the opening no more than 44 inches above the floor. Every sleeping room, basement and habitable attic needs one.

By MDG Builders · November 9, 2026

missing photo

What size does an egress window have to be in California?

Four numbers, all met at once. The 2025 California Residential Code, in effect since January 1, 2026, puts them in Section R319. County handouts written for the new code quote the section directly, including San Bernardino County's residential window replacement guide, revised May 2026, and Orange County's window changeout handout, revised December 2025.

If you have seen the rule cited as R310, that is the old number, used through the 2022 edition and still printed on many city handouts. The dimensions are the same.

  • Net clear opening area: at least 5.7 square feet (R319.2.1).
  • Grade-floor openings: at least 5 square feet.
  • Net clear height: at least 24 inches (R319.2.2).
  • Net clear width: at least 20 inches (R319.2.2).
  • Bottom of the clear opening: no more than 44 inches above the floor (R319.2.3).

Why does a 20 by 24 inch opening fail the egress rule?

Because the minimum width and minimum height together do not reach the minimum area. Work it out: 20 x 24 = 480 square inches, and 480 / 144 = 3.33 square feet. The requirement is 5.7 square feet, which is 5.7 x 144 = 820.8 square inches.

So if the opening is only 20 inches wide, it has to be 820.8 / 20 = 41.04, so about 41 inches high. If it is only 24 inches high, it has to be 820.8 / 24 = 34.2 inches wide. San Bernardino County's handout prints the same pairs in a table. For a grade-floor window at 5 square feet, or 720 square inches, a 20 inch wide opening needs 36 inches of height.

Net clear means the hole left with the window open by normal operation, not the size of the glass or the frame.

Which rooms need an emergency escape and rescue opening?

Basements, habitable attics and every sleeping room need at least one operable opening, and when a basement contains bedrooms, each bedroom needs its own. The opening has to work from inside without keys, tools or special knowledge. The Los Angeles ADU bulletin adds that it must open directly to a yard or public way.

A door to the outside can serve as the escape opening. Rooms that are not for sleeping, such as a living room or an office, are not on the list. If a bathroom remodel takes over the wall that holds a bedroom's only qualifying window, the room loses its escape route.

A worked example: checking three bedroom windows with a tape measure

Open each window fully, measure the clear gap, multiply, and divide by 144.

Bedroom one has a casement that swings clear. The opening is 22 inches wide and 38 inches high: 22 x 38 = 836 square inches, and 836 / 144 = 5.81 square feet. That passes on any floor if the sill is at 44 inches or lower.

Bedroom two has a single hung window. Only the bottom half opens, giving 30 inches of width and 26 inches of height: 30 x 26 = 780 square inches, or 5.42 square feet. On an upper floor that fails by 0.28 square feet. On a grade floor it passes, because the limit there is 5.

Bedroom three has a slider with a 4 foot wide frame. One panel slides, leaving a clear opening 21 inches wide and 42 inches high: 21 x 42 = 882 square inches, or 6.13 square feet. It passes on area, height and width, but its sill sits 47 inches above the floor, so it fails. Lowering it is framing work.

Which window styles meet egress most easily?

Casements, because the whole sash swings out of the way. Sliders and hung windows open only half their frame, so they must be much larger for the same clear opening. The City of Torrance's window replacement guideline, dated May 2026, gives working minimums unless manufacturer data shows otherwise: 2 feet 4 inches by 4 feet for a single casement, 3 feet by 5 feet for a single or double hung window, and 4 feet by 4 feet for a slider.

Treat those as shopping sizes only. Frames and stops eat into the clear opening, and our frame comparison covers the materials. Ask the supplier for the net clear opening of the exact unit, in writing, before ordering a replacement window for a bedroom.

Do replacement windows in an older house have to meet today's egress size?

Not always. Section R319.5 exempts a replacement window from the size rules when two conditions hold. First, the new window is the manufacturer's largest standard size that fits the existing frame or rough opening, in the same operating style as the old one or a style that gives an equal or greater opening. Second, the replacement is not part of a change of occupancy.

In plain terms, you may keep an undersized bedroom opening if you do not make it worse.

Cities apply this with their own emphasis. Santa Clarita lets some in-frame replacements skip a permit only if any egress window is replaced with a code egress window. Beverly Hills asks for egress details for bedroom windows with the application, and Agoura Hills says altering a non-compliant egress window triggers current dimensions. Our guide to window permits in Los Angeles covers the City's own path.

What do garage conversions and ADUs need for escape windows?

A converted garage is held to dwelling rules. LADBS Information Bulletin P/BC 2026-150, revised August 13, 2026, requires an emergency escape and rescue opening from every sleeping room, opening directly to a yard or public way, at 24 inches clear height, 20 inches clear width, 5.7 square feet and no more than 44 inches above the finished floor. Its inspection checklist allows 5 square feet for ground-floor windows.

The same bulletin sets daylight and fresh air minimums for habitable rooms: glazing equal to 8 percent of the floor area and openable area equal to 4 percent, unless mechanical systems make up for them.

The infilled garage door wall is the natural place to put that window. Plan it early in the ADU drawings, since the window size, the sill height and the wall framing all have to agree. See our garage conversion permit steps and ADU and JADU comparison.

What about basement bedrooms, window wells and decks?

Below-grade openings need somewhere to climb out to. Under R319.4.1 an area well must have a horizontal area of at least 9 square feet, with a projection and width of at least 36 inches, and must let the window open fully. Some hillside homes in Los Angeles have a lower level cut into the slope, and a bedroom there is held to the same rule.

Decks matter too. R319.2.4 says an escape opening under a deck, porch or cantilever must be fully openable and lead to a path at least 36 inches high and 36 inches wide out to a yard or court. Before adding a low deck outside a bedroom, check the window behind it. We did not verify any exception for sprinklered basements.

Can you put security bars on a bedroom window, and who does the work?

Yes, with a release. R319.4.4 requires bars, grilles and screens over escape openings to be releasable or removable from the inside without a key, tool or more force than normal operation takes. Los Angeles lists security bars as an Express Permit and repeats that bedrooms need a quick release.

Enlarging or lowering an opening to gain egress is structural work that needs a permit. MDG Builders, CSLB #1040337, draws and permits that work as the general contractor, and licensed framing, stucco and window subcontractors carry it out. We found no dated, independent price for adding an egress window here, so we print none. Wall type, header size and stucco patching drive the cost. In Torrance and other cities with published guidelines, bring the city's form to the first site visit.

FAQ

Egress window questions

What size egress window is required in California?

The net clear opening must be at least 5.7 square feet, or 5 square feet at a grade floor, with at least 24 inches of clear height and 20 inches of clear width. The bottom of the opening can be no more than 44 inches above the floor. These come from Section R319 of the 2025 California Residential Code.

Do you need a permit to add an egress window?

Yes. Cutting a new opening or enlarging one changes the wall framing, which is permit work, and even cities that exempt like-for-like swaps, such as Irvine, do not exempt adding or enlarging a window. In Los Angeles only same-size, same-type change-outs qualify for the no-plan-check Express Permit, so a new egress opening goes through review.

Does every bedroom need an egress window?

Every sleeping room needs an emergency escape and rescue opening, which can be a window or a door to the outside. The code also requires one in basements and habitable attics.

Do replacement windows have to meet current egress size?

Not if the exemption in Section R319.5 applies. The replacement must be the manufacturer's largest standard size that fits the existing opening, keep the same operating style or one with an equal or larger opening, and not be part of a change of occupancy. Otherwise current dimensions apply.

Can a deck block a bedroom escape window?

No. A window under a deck, porch or cantilever must still open fully and lead to a clear path at least 36 inches high and 36 inches wide out to a yard or court. A new deck built tight against a bedroom window can put the room out of compliance.

Does a slider window count as an egress window?

It can, if the open half is big enough. Only one panel moves, so the clear opening is about half the frame. Torrance's 2026 guideline suggests at least 4 feet by 4 feet. Measure the clear opening to confirm.

Services

Work that goes with this

Windows by city

ADU Construction by city

Decks by city

Ready to plan your project?

Call or send the form. We schedule a site visit and send a written proposal.

Call (888) 666-8224