What Does It Cost to Replace a Concrete Driveway in Los Angeles?
Replacing a concrete driveway in Los Angeles runs about $8 to $20 per square foot, and Angi's May 2026 figures put a typical job between $3,067 and $16,472 with an average of $7,270. Breaking out the old slab adds $1.40 to $2.30 per square foot. Size, thickness, grading and the street apron decide where you land.
How much is a new concrete driveway per square foot in LA?
Angi, the home services marketplace, updated its Los Angeles concrete driveway page on May 5, 2026. It gives $8 to $20 per square foot, an average job of $7,270 and a normal range of $3,067 to $16,472. Its size table prices a 10 by 20 foot single pad at $1,800 to $3,200 and a 24 by 24 foot pad at $5,200 to $9,200.
Read the method before you trust the number. Angi says its local figures start from national averages and are adjusted with the federal Bureau of Economic Analysis regional price index. So this is a modeled estimate, not a survey of driveways poured here. It is still the best dated, public number we found for concrete work in the city.
Concrete driveway price table for Los Angeles
These rows come from two Angi pages for Los Angeles, both dated 2026. They are modeled local estimates, so use them to check a bid, not to replace one.
| What it covers | Typical range | What moves the price |
|---|---|---|
| New concrete driveway, installed | $8 to $20 per sq ft | Thickness, reinforcement, finish, access for the truck or pump |
| Typical whole job | $3,067 to $16,472 (average $7,270) | Driveway size is the main driver |
| 20 x 20 ft (400 sq ft) | $3,600 to $6,400 | Shape, slope, number of joints |
| Demolition of an unreinforced slab | $1.40 to $2.30 per sq ft | Rebar or mesh in the old slab, haul distance, dump fees |
| Grading and site preparation | $1 to $3 per sq ft | Soft soil, roots, slope, drainage changes |
| Permit for the street apron | $150 to $400 | Apron and curb size; city fees are set by ordinance |
How we got these numbers: Angi's Los Angeles concrete driveway cost page (updated May 5, 2026) and its Los Angeles concrete slab cost page (updated April 23, 2026). Angi states that local figures are national averages adjusted with Bureau of Economic Analysis regional price data, so they are estimates, not a survey of Los Angeles jobs. Confidence is medium for flat, accessible lots and low for hillside driveways. MDG's written proposal for your driveway is the real price.
What does tearing out the old driveway add?
A replacement is two jobs: demolition and a new pour. Angi's Los Angeles page lists demolition of a standard unreinforced slab at $1.40 to $2.30 per square foot. A slab with rebar or wire mesh in it takes longer to break and sort, so expect the upper end or more.
The same page lists grading and site preparation at $1 to $3 per square foot, and says some projects need soil compaction testing at $2,000 to $6,000. That last line matters on hillside lots and on fill.
Angi does not say whether its $8 to $20 rate includes removal. Ask every bidder to price demolition as its own line.
Worked example: a 720 square foot two-car driveway
Take a driveway 18 feet wide and 40 feet long. 18 x 40 = 720 square feet. At Angi's range the new concrete is 720 x $8 = $5,760 at the low end and 720 x $20 = $14,400 at the high end.
Demolition is 720 x $1.40 = $1,008 up to 720 x $2.30 = $1,656. If demolition is not inside the per-foot price, the job becomes $5,760 + $1,008 = $6,768 at the low end and $14,400 + $1,656 = $16,056 at the high end. Add $1 to $3 per square foot if the base needs regrading: 720 x $1 = $720 up to 720 x $3 = $2,160.
That spread is honest. A flat lot in Torrance with truck access to the curb sits near the bottom. A steep, curved drive in the hills above Glendale that needs a pump truck and drains sits near the top or beyond it.
Why do two pages from the same source disagree?
Angi also publishes a Los Angeles concrete slab page, updated April 23, 2026. It prices a 500 square foot two-car driveway at $3,420, which is $6.84 per square foot, and lists driveways at $6.84 to $13.68 per square foot depending on thickness. The driveway page starts at $8.
The slab page prices a plain slab by thickness. The driveway page prices a whole project, with forms, finishing and often removal. The gap shows that thickness, reinforcement and scope move the price more than the word driveway does.
How thick should a driveway be, and does it need rebar?
Angi's slab page lists driveways at 4 to 8 inches thick. Thickness is the biggest material decision, because going from 4 inches to 6 inches adds half again as much concrete. The same page prices a standard slab at $6.84 per square foot, a rebar reinforced slab at $7.98 and a high-strength mix at $9.12, and notes that Los Angeles contractors often choose mixes of 3,500 psi or more.
We did not find a City of Los Angeles code section that sets a thickness for a private residential driveway, so we will not quote one. The street apron is different: it is built to a city standard plan. If you park a loaded truck or an RV, say so before the bid, and have each bidder put these items in writing:
- Square footage measured on site.
- Demolition, haul-off and dump fees as a separate line.
- Slab thickness, concrete strength, and rebar or mesh size and spacing.
- Base preparation and compaction.
- Control joint spacing and the finish.
- Who pulls the street permit if the apron or sidewalk is touched.
- When you can walk on it and park on it.
Is the apron at the street part of your driveway price?
Often it is priced separately, and it has its own permit. The sloped section between the curb and your property line sits in the public right of way. In the City of Los Angeles that work needs an A-Permit from the Bureau of Engineering, and Angi's page puts driveway permits at $150 to $400. We cover the process, the width limits and the city's inspection fees in our guide to driveway approach permits in Los Angeles.
The same crew can pour the slab and the apron on one day, but the city inspects the apron. A bid that ignores a cracked apron is incomplete, wherever in Los Angeles the house is. If a fence or gate will cross the drive, set its posts before the pour.
Who is licensed to pour a driveway in California?
Concrete flatwork belongs to the CSLB C-8 Concrete classification, which covers a contractor who forms, pours, places, finishes and installs specified mass, pavement, flat and other concrete work. MDG Builders holds CSLB #1040337 with the B General Building and C-61/D12 classifications. On a driveway we plan the job, handle the permit and schedule the work, and a licensed concrete subcontractor does the forming and the pour. You can ask for that company's license number and certificate of insurance, and check the license yourself.
A driveway is often one piece of a bigger exterior project. Schedule it after the heavy trucks stop coming, such as roofing tear-off bins and lumber deliveries. Pouring first and then driving a loaded dumpster truck across it is an avoidable mistake.
How large a deposit can a driveway contractor ask for?
Business and Professions Code section 7159 caps the down payment on a home improvement contract at $1,000 or 10 percent of the contract price, whichever is less. On Angi's $7,270 average, 10 percent is $727, so the cap is $727, not $1,000. On a $16,000 driveway, 10 percent is $1,600, so the cap is $1,000.
After the deposit, payments are supposed to follow finished work: demolition complete, forms and steel inspected, concrete placed. Our post on reading a remodeling contract covers the other required terms.
Driveway replacement questions
How much should I expect to pay for a concrete driveway in Los Angeles?
Plan on $8 to $20 per square foot. Angi's May 2026 page for Los Angeles shows an average job of $7,270 and a normal range of $3,067 to $16,472. A 400 square foot pad is listed at $3,600 to $6,400, and tearing out the old slab adds $1.40 to $2.30 per square foot.
Is 4 inches of concrete thick enough for a driveway?
It can be for passenger cars on a well compacted base, and Angi's Los Angeles slab page lists driveways at 4 to 8 inches. Heavier vehicles, weak soil or a slope call for more thickness or reinforcement. Get the thickness and the steel written into the proposal so every bid prices the same slab.
How much does a 24x24 concrete slab cost?
Angi's Los Angeles driveway table puts a 24 by 24 foot pad, 576 square feet, at $5,200 to $9,200 with an average of $7,200. That works out to about $9 to $16 per square foot. Demolition, regrading and any street apron work are extra if the bid does not list them.
How long before you can drive on new concrete?
It depends on the mix, the thickness and the weather, so the answer should come from the contractor who placed it, in writing. We did not find an official Los Angeles source that sets a number of days, and we do not print one. Ask for separate dates for foot traffic, cars and heavy vehicles.
Can you pour new concrete over an old driveway?
Usually it is the wrong fix for a broken driveway, because cracks and movement in the old slab come through the new layer. Thin overlays suit sound slabs with surface wear. Angi's Los Angeles stamped concrete page, dated July 2026, lists resurfacing at $7 to $20 per square foot, which is close to replacement money.
Work that goes with this

Concrete
Patios, driveways, walkways and retaining walls, poured by licensed specialists and priced from sources.
See concrete work →
Fencing
Wood, vinyl, iron and block fences with the permit and height rules checked first.
See fencing →
Roofing
Shingle, tile and metal roofs with LADBS permit rules, fire-zone requirements and sourced costs.
See roofing →More on concrete
Do You Need a Permit for a Concrete Driveway in Los Angeles?
The street apron needs a Bureau of Engineering A-Permit. Width limits, banned curb cut locations, city inspection fees and the steps.
Read the guide →Stamped Concrete or Pavers: Which Is Better for a California Yard?
Stamped concrete and pavers compared on installed price, repairs, sealing, drainage and clay soil, with dated Los Angeles numbers.
Read the guide →Concrete Slab Cracks in Southern California: When Should You Worry?
Which slab cracks are shrinkage and which point to soil movement, how to track a crack, the drainage numbers in the code, and who to call.
Read the guide →Ready to plan your project?
Call or send the form. We schedule a site visit and send a written proposal.