How Much Does a Kitchen Remodel Cost in California?
A kitchen remodel in Los Angeles usually costs about $25,000 to $45,000 for a refresh in the same layout, $45,000 to $90,000 for a full remodel with new cabinets, counters and appliances, and $90,000 to $170,000 or more for upscale work or a layout change. These ranges are built from published 2025 and 2026 data, not a quote.

What does a kitchen remodel cost in Los Angeles?
The phrase kitchen remodel covers three different jobs, and each has its own price band. A refresh keeps the layout and replaces surfaces and some fixtures. A full remodel keeps the sink, range and walls where they are but replaces cabinets, counters, appliances, lighting and flooring. An upscale or layout-change kitchen moves plumbing, gas or walls, and that is where the total climbs fastest.
The best single anchor is the Remodeling magazine Cost vs. Value 2025 report for Los Angeles, published in September 2025. It lists a minor midrange kitchen at $29,765, a major midrange kitchen at $86,214 and a major upscale kitchen at $171,369. The costs come from Verisk XactRemodel local data. We could not retrieve the report's project scope text, so use those labels as a guide to size, not as a specification.
Why do published kitchen prices disagree?
Because each source counts a different mix of jobs. Thumbtack's Los Angeles page, updated in July 2026, shows $12,471 to $40,909 from data supplied by its own pros, with no sample size given. That range includes small jobs such as counter swaps, which pulls the top end down. Sweeten, a contractor-matching service, lists medium kitchens with no layout change starting at $24,500, $37,500 and $76,000 for three finish levels, and says its figures include the contractor's margin.
The Houzz 2026 Houzz & Home Study surveyed 10,176 renovating homeowners across the country and reports a median of $24,000 for all kitchens, $55,000 for major ones and $20,000 for minor ones. It is a national number, and Los Angeles labor and permit costs are not in it.
- A number with no stated scope is not a price, it is a headline.
- Totals that mix cabinet swaps with full gut remodels will always look lower.
- Marketplace figures include the marketplace's own contractors only.

Kitchen remodel cost table for Los Angeles
These three bands are our reading of the sources below, anchored to the Cost vs. Value Los Angeles report. Each one assumes the scope named in the first column.
| What it covers | Typical range | What moves the price |
|---|---|---|
| Refresh, same layout: surfaces, hardware, some fixtures, paint | $25,000 to $45,000 | Cost vs. Value minor midrange is $29,765; Sweeten starts at $24,500; Thumbtack tops out at $40,909 with small jobs included |
| Full remodel, same layout: new cabinets, counters, appliances, lighting, flooring | $45,000 to $90,000 | Cost vs. Value major midrange is $86,214; cabinet grade and appliance choices set most of the spread |
| Upscale or layout change: moved sink, range or wall, custom cabinetry | $90,000 to $170,000 and up | Cost vs. Value major upscale is $171,369; structural work, engineering and plan check add to it |
| National all-kitchen median, for comparison only | $24,000 | Houzz 2026 study, 10,176 homeowners, not specific to Los Angeles |
How we got these numbers: Remodeling magazine's Cost vs. Value 2025 report for Los Angeles (published September 2025, costs from Verisk XactRemodel), Thumbtack's Los Angeles page (updated July 2026), Sweeten's Los Angeles kitchen guide (modified October 2025) and the Houzz 2026 Houzz & Home Study (fielded January to March 2026, national). We rounded to ranges and did not average the sources. MDG's written proposal for your kitchen is the real price.
Where does the money go in a kitchen remodel?
Every kitchen bid is a stack of trades, and each trade is licensed under its own CSLB classification. Cabinets and finish carpentry fall under C-6, plumbing under C-36, electrical under C-10, tile under C-54, drywall under C-9, flooring under C-15 and painting under C-33. Taking out a wall adds framing (C-5), and often an engineer. On top of the trades sit permit fees, disposal, design time and the contractor's coordination.
None of the published sources we found prints a percentage split between those lines with a method behind it, so we do not print one either. What you can control is the order of magnitude: layout changes add plumbing, gas, electrical and drywall work at once, while new cabinet doors on the same boxes touch far fewer trades.
Nearly half of the homes in the City of Los Angeles were built before 1960, according to the city's Housing Element. Opening walls in an older house can reveal surprises, so ask how the proposal prices them.
A worked example: comparing two bids for the same kitchen
The numbers below are invented to show the arithmetic, they are not prices. Say two contractors bid a 120 square foot kitchen in the same layout. Bid 1 is $46,000 and carries a $9,000 cabinet allowance and a $4,500 countertop allowance. Bid 2 is $52,500 with cabinets fixed at $11,200 and counters at $5,100, and it includes the permit fees.
An allowance is a placeholder, so first put both on equal footing. If your chosen cabinets cost $11,200, Bid 1 grows by $2,200. If your counters cost $5,100, it grows by another $600. Bid 1 becomes $46,000 + $2,200 + $600 = $48,800. The real gap is now $52,500 - $48,800 = $3,700, and the useful question is whether Bid 1 leaves out the permit fees that Bid 2 includes.
Which permit and contract rules change what you pay?
Permits first. In the City of Los Angeles, a kitchen remodel with no structural changes is listed as an Express Permit, issued without plan check, in LADBS Information Bulletin P/GI 2026-003. Moving walls or changing the floor plan goes to plan check, which adds time and fees. Our guide to kitchen remodel permits in Los Angeles sorts the common changes into each path.
Next, the contract. California Business and Professions Code section 7159 applies to home improvement contracts over $500. The down payment may not exceed $1,000 or 10 percent of the contract price, whichever is less, and CSLB lists narrow exceptions. On a $50,000 kitchen, 10 percent is $5,000, so the cap is $1,000. Later payments cannot run ahead of the work done, and every change must be a signed written change order.
Energy rules matter for the shopping list. The 2025 Energy Code took effect on January 1, 2026, and the California Energy Commission summary calls for local mechanical exhaust in kitchens, field-verified range hood airflow and sound, and dimmers on kitchen lighting except lighting built into the hood. Which of those apply to an alteration, as opposed to new construction, we have not confirmed, so ask your contractor to state it in the proposal.
What should a written kitchen proposal list?
A one-line total tells you nothing. MDG is a licensed general contractor, CSLB #1040337, that designs, permits and manages the job while licensed subcontractors do the field work. Under the contract rules above, you can ask for the name, license number and classification of every subcontractor, and for each one's certificate of insurance. A proposal worth signing should also name:
- The kitchen size and what is in scope: demolition, framing, plumbing, electrical, cabinets, counters, backsplash, flooring, paint.
- Every allowance, with the dollar amount and what happens if your choice costs more.
- Who pulls and pays for each permit, and the permit number once issued.
- Brand and model of appliances, or a note that you supply them.
- A payment schedule tied to finished work, starting at the legal down payment cap.
- Start and finish dates, and how delays are handled.
Does a kitchen remodel pay for itself in Los Angeles?
Partly, and the smaller the job, the better it recovers. The 2025 Cost vs. Value report for Los Angeles puts the minor kitchen at a 126.9 percent recoup and the major midrange remodel at 56.9 percent, based on a survey of more than 6,000 real estate professionals about resale value. On the $86,214 major project, 56.9 percent is about $49,000 back at sale, which leaves roughly $37,000 as the cost of living in a better kitchen.
Treat resale math as one input. How long you will stay and how you cook matter more than any percentage.
Kitchen remodel cost questions
How much does a kitchen remodel cost in California?
Our sourced data is for Los Angeles: about $25,000 to $45,000 for a refresh, $45,000 to $90,000 for a full remodel in the same layout, and $90,000 to $170,000 or more for upscale work. We did not find a dated, method-backed statewide figure, so other regions need their own quote.
Can you remodel a kitchen in Los Angeles for under $30,000?
Yes, if the layout stays and the scope is a refresh. Cost vs. Value 2025 prices a minor midrange Los Angeles kitchen at $29,765, and Sweeten starts medium kitchens at $24,500. A new layout, new cabinets throughout and upgraded appliances will exceed that figure.
How much can a contractor ask for up front on a kitchen remodel?
No more than $1,000 or 10 percent of the contract price, whichever is less, under Business and Professions Code section 7159. The statute lists narrow exceptions, which CSLB describes on its home improvement contract pages. A deposit above the cap is a reason to stop and call CSLB.
Do I need a permit for a kitchen remodel in Los Angeles?
Usually yes. LADBS lists a residential kitchen remodel with no structural changes as an Express Permit, and wall removal or a changed floor plan goes through plan check. Whether a cabinet or countertop swap alone needs one is not confirmed in the text we read, so ask LADBS before you assume.
Will a kitchen remodel add value to my Los Angeles home?
It adds some. The 2025 Cost vs. Value report for Los Angeles shows a 126.9 percent recoup for a minor kitchen and 56.9 percent for a major midrange remodel. Those are survey-based resale estimates, so a larger project returns a smaller share of its cost.
How do I check a kitchen contractor's license?
Search the license number on the CSLB website and confirm the status is active, the classification fits the work and a bond is on file. MDG Builders holds CSLB #1040337, and you can ask us for each subcontractor's license number and certificate of insurance.
Work that goes with this

Kitchen Remodeling
Cabinets, counters, layout changes, permits and a written schedule, with prices tied to named sources.
See kitchen remodeling →
Flooring
Hardwood, engineered wood, vinyl plank, laminate and tile, with slab testing and a written scope.
See flooring →
Painting
Interior, exterior, stucco and cabinet painting with real prep, lead-safe rules followed and a written scope.
See painting →Keep reading

Do You Need a Permit for a Kitchen Remodel in Los Angeles?
Which kitchen changes get an LADBS Express Permit, which go to plan check, what the 2025 Energy Code adds, and what we could not confirm.
Read the guide →
How to Check a Contractor's License in California
Read a CSLB license record line by line, learn what a B license means, and see MDG's own record as a worked example.
Read the guide →
How General Contractors Use Subcontractors
Why most general contractors hire specialists for the field work, what that means for you, and what to ask for in writing.
Read the guide →Ready to plan your project?
Call or send the form. We schedule a site visit and send a written proposal.