Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Deck permits

Do You Need a Permit to Build a Deck in Los Angeles?

Quick answer

Most decks in Los Angeles need a building permit. The city code only exempts platforms that sit 30 inches or less above grade and are not over a basement or story below. Above 30 inches you also need a 42-inch guard, and any deck fastened to the house has to meet the ledger and hold-down rules.

By MDG Builders · November 9, 2026

missing photo

What does the Los Angeles code say about decks and permits?

The rule is one line long. Los Angeles Municipal Code section 91.106.2, last amended by Ordinance 188,797 effective December 31, 2025, lists the work that needs no building permit. Item 5 reads: platforms, walks and driveways not more than 30 inches above grade and not over any basement or story below. Everything else is permit work.

The word in the code is platforms, not decks, and the section does not say whether fastening a low platform to the house changes the answer. We found no city document that settles it, so describe the exact deck to LADBS before assuming a low attached one is exempt. The same section opens with a warning that an exemption never authorizes work that breaks the building code or the zoning code. A deck that needs no permit still has to respect yard setbacks and be built correctly.

Item 1 of that list also exempts work valued at $2,500 or less, but not when the work affects structural stability or public safety. A raised deck does both, so the dollar exemption is no way around the 30-inch line.

How high can a deck be before it needs a railing?

Thirty inches again. The 2025 California Residential Code, in effect since January 1, 2026, requires a guard where a walking surface is more than 30 inches above the floor or grade below, measured at any point within 36 inches of the open edge (section R321.1.1). The 36-inch reach matters on sloped yards, where the ground can fall away just beyond the deck edge.

California sets the guard at 42 inches minimum, taller than the 36 inches many national guides quote. Openings may not pass a 4-inch sphere. LADBS repeats the 42-inch figure in its deck bulletin and adds a zoning twist: in a required yard the guard must be 75 percent open.

How far can a deck extend into a required yard in Los Angeles?

Six feet out and six feet up. LADBS Information Bulletin P/ZC 2023-004, effective January 1, 2023, explains Zoning Code section 12.22 C.20. An open, unroofed deck attached to the building may project up to 6 feet into a required front, side or rear yard, may be no more than 6 feet above the natural ground next to it, and may not sit above the first floor closest to grade at that spot.

Two details catch people. The front-yard allowance is switched off on lots under the Hillside Ordinance or Baseline Hillside Ordinance, which we cover in our post on hillside deck rules in Los Angeles. A detached deck counts as its own structure only if it is at least 10 feet from the building, and then it may not project into any required yard at all.

What will the inspector check at the ledger, footings and hold-downs?

Section R507 of the California Residential Code is the deck chapter, and four of its rules do most of the work. A deck outside these tables, with steel, long spans or tall posts, needs engineered design instead.

  • Ledger (R507.9.1.1): at least a 2x8, pressure-treated or naturally durable, never carrying a beam or girder, and never fastened through stone or masonry veneer.
  • Fasteners (R507.9.1.3 and R507.2.3): half-inch lag screws or bolts, hot-dipped galvanized or stainless, staggered top and bottom, with the ledger flashed so water cannot reach the house band joist.
  • Lateral load (R507.9.2): two hold-down devices rated 1,500 pounds each within 24 inches of the deck ends, or four devices rated 750 pounds each.
  • Footings (R507.3): concrete footings sized from the table by the area each post carries and the soil bearing value. A free-standing deck may skip footings only if joists sit on precast pier blocks at grade, the deck is 200 square feet or less, and the surface is no more than 20 inches above grade.

A worked example: a 12 by 16 foot deck off a back door

Take a deck 16 feet wide along the house and 12 feet deep, with the walking surface 34 inches above the lawn. At 34 inches it is over the 30-inch line, so it needs a permit and a 42-inch guard.

The ledger carries half of each 12-foot joist and a beam on three posts carries the other half. The beam's strip is 6 feet x 16 feet = 96 square feet. The middle post takes 8 feet x 6 feet = 48 square feet and each end post takes 4 feet x 6 feet = 24 square feet. In Table R507.3.1, at a 40 pound live load on the weakest soil column of 1,500 pounds per square foot, 48 square feet falls between the 40 and 60 rows, so you size up to the 60 row: a 17-inch square or 19-inch round footing.

For the ledger, the table for a 12-foot joist span at 40 pounds per square foot allows half-inch lag screws at 15 inches on center. A 16-foot ledger is 192 inches, and 192 / 15 = 12.8, so plan on about 13 lag screws, plus the two 1,500-pound hold-downs.

Is a deck an over-the-counter permit or plan check?

Expect plan check. LADBS bulletin P/GI 2026-003, revised June 10, 2026, lists the jobs that get an Express Permit with no plan review. A new deck is not on it. The only deck item is applying an approved coating to an existing balcony or deck, and the express item for replacing damaged framing says in so many words that it does not include decks.

On cost, Angi's Los Angeles deck page, updated October 28, 2025, says permits here run $500 to $3,000 or more depending on the project. We could not confirm a deck fee in the city fee schedule, so treat it as a survey figure. If the lot is in a Fire Hazard Severity Zone, LADBS adds its wildfire checklist, which limits the decking surface to tested, ignition-resistant or noncombustible material. See composite compared with wood decking before you choose boards.

What if the house is outside the City of Los Angeles?

Each building department writes its own exemption list. In unincorporated Los Angeles County, the Public Works exempt work page cites Title 26 section 106.3: decks, walks and driveways not more than 30 inches above grade and not over any basement or story below.

Cities such as Glendale, Pasadena and Santa Monica run their own counters, so confirm the rule with the department that will inspect the work.

What should the deck contract and permit set include?

MDG Builders, CSLB #1040337, draws the deck, files for the permit and schedules the inspections, and a licensed framing subcontractor builds it. Before work starts, request the deck builder's license number and proof of insurance, then look the license up on the CSLB site. The same goes for deck construction that ties into concrete footings or a new fence line.

Business and Professions Code section 7159.5 caps the down payment at $1,000 or 10 percent of the contract price, whichever is less, and bars a contractor from collecting more than the value of work done or material delivered. The drawings should show:

  • A site plan with the deck's distance to each property line and its height above natural grade at the outer edge.
  • Framing plan with joist size and spacing, beam, posts and footing sizes.
  • Ledger detail: fastener type, spacing, flashing and the hold-down devices.
  • Guard height, opening size and how the posts connect to the framing.
  • Decking product and, in a fire zone, the test standard it meets.
FAQ

Deck permit questions

Do I need a permit for a ground-level or floating deck in Los Angeles?

Usually not, if the surface is 30 inches or less above grade and not over a basement or story below. That is the platform exemption in Los Angeles Municipal Code section 91.106.2. Zoning setbacks still apply, and the code does not say how attachment to the house is treated, so describe the deck to LADBS before you build.

Does a 3 foot high deck need a railing?

Yes. Three feet is 36 inches, and the California Residential Code requires a guard once the walking surface is more than 30 inches above the ground within 36 inches of the edge. The guard must be at least 42 inches high, measured from the deck surface.

What is the 4 ball rule for deck railings?

It means no gap in a required guard may let a 4-inch sphere pass through. California Residential Code section R321.1.3 sets the limit so a small child cannot slip between balusters. On the open side of a stair the limit is slightly larger, 4 and 3/8 inches.

Why do you need a permit to build a deck?

Because a raised deck is a structure that people can fall from or that can pull away from the house. The permit puts the ledger connection, hold-downs, footings and guard in front of a plan checker and an inspector. Those are the parts section R507 of the California Residential Code regulates in detail.

How far can a deck stick out into my setback in Los Angeles?

Up to 6 feet into a required yard, as long as it is open, unroofed, attached to the building, no more than 6 feet above natural grade and not above the first floor. LADBS bulletin P/ZC 2023-004 explains the rule. Front yards on Hillside Ordinance lots do not get this allowance.

How does a deck ledger have to be attached under California code?

With half-inch lag screws or bolts into the house band joist, never nails alone. Section R507.9 requires at least a 2x8 treated ledger, corrosion-resistant fasteners spaced from a table by joist span, flashing above the ledger, and hold-down devices for lateral load. A ledger may not be fastened through stone or masonry veneer.

Services

Work that goes with this

Decks by city

Concrete by city

Fencing by city

Ready to plan your project?

Call or send the form. We schedule a site visit and send a written proposal.

Call (888) 666-8224